KESARI INFRABUILD PRIVATE LIMITEDEnvironmental Infrastructure Services

Civil EPC consultants in Uran.

Civil EPC in Uran, on the ground where the work actually is, the JNPT port and Dronagiri industrial node, carried by a QCI-NABET accredited team, end to end.

Why Uran

The local ground civil epc sits on.

Handled through
SEIAA Maharashtra · MPCB Raigad · CIDCO / Uran MC
Local ground
The JNPT port belt, the Dronagiri node and the ONGC Uran complex
Typically for
Developers, municipal bodies, industry, institutional owners

Uran is the MMR's port and energy edge: the JNPT / Nhava Sheva container terminals, the ONGC Uran processing plant and CIDCO's Dronagiri node sit here, beside creek, mudflat and CRZ-governed shoreline. Port-linked logistics and industrial projects drive heavy clearance work.

KIPL carries civil epc from a base in the region: which matters when the work runs through SEIAA Maharashtra · MPCB Raigad · CIDCO / Uran MC. Comparable, accredited projects across the Mumbai Metropolitan Region are on the record: carried through to completion by named people, not passed down a chain.

Civil EPC · Uran

A green project can be undone by the concrete beneath it. So we build that too.

Local demand

What drives civil epc in Uran.

Port and port-linked development leads here: terminal, jetty and logistics projects under the harbours/ports category (item 7(e)) and the freight and warehousing growth around the Dronagiri node, all of it on a coastline where the CRZ Notification governs the shoreline.

The ONGC processing complex and energy infrastructure add scheduled industrial EC and consent work, while the mudflats, mangroves and creek make CRZ status and coastal ecology central to almost every file at Uran.

How it works

Civil EPC, the route to grant.

The full service →
  1. 01/04

    Engineering

    Civil and structural design for the water, road, open-space or facility works.

  2. 02/04

    Procurement

    Materials and subcontracts procured to specification and programme.

  3. 03/04

    Construction

    Turnkey construction: water infrastructure, roads, open spaces, playgrounds and facility civil works.

  4. 04/04

    Commissioning & handover

    Testing, finishing and handover of a build that does the job it was designed for.

Proof

Comparable work we've delivered.

civil EPC construction of public infrastructure

TCS, Banyan Park · Mumbai

IRRIGATION WORK AT TCS BANYAN PARK

Design and execution of an efficient drip-irrigation network across ~10,000 m² of landscape and plantation zones: pipeline, network and testing, completed in 45 days.

~10,000 m²Area
45 daysDelivery
See the full case →

The record

The work, project by project.

Mandate, method and measured outcome, written end to end for every project on this list.

A 120 KLD effluent treatment plant on a conventional treatment process.

Read the case study
05 / 08

On the ground

Across Uran, and the belt around it.

Local means the node, not the pin on the map. We carry civil epc across the Uran nodes and the wider Mumbai Metropolitan Region: where the units, plots and projects actually sit.

Straight answers

Civil EPC in Uran: common questions.

01Do port and jetty projects at Uran need environment clearance?

Yes: ports, harbours and related marine infrastructure fall under the EIA schedule (item 7(e)) and, on this coast, the CRZ Notification too. We prepare the EC and CRZ files together for JNPT-area projects.

02How does the CRZ shape a Dronagiri or Uran project?

The coastline, mudflats and mangroves place most Uran plots in the regulated coastal zone, which governs what and where you can build. We fix the CRZ category and line before anything is designed.

03Who appraises industrial projects at Uran?

SEIAA Maharashtra or, for larger Category A activities, the central authority; with MPCB Raigad for consent and CIDCO/Uran MC for planning. We map the category and carry the file accordingly.

04Who handles civil epc for an Uran project, and how long does it take?

SEIAA Maharashtra · MPCB Raigad · CIDCO / Uran MC are the bodies an Uran project deals with. Timelines depend on the project's category and scale, by project scope and schedule. KIPL prepares and carries the work through, tracked to the outcome, and maps a realistic Uran timeline at the screening stage, with comparable work on the record such as IRRIGATION WORK AT TCS BANYAN PARK.

By industry

The same filing, read for your sector.

Clients & partners

The work is trusted where the stakes are highest.

Two decades of clearances, treatment plants and green infrastructure delivered for India’s builders, industry and public bodies, and the global engineering firms beside them.

Reliance IndustriesPhoenix MarketcityTata Consultancy ServicesAECOMAirTrunkJacobsAuricAGPPyramid InfratechNeelkanth InfratechJ P InfraPentagon PremisesEmperiaDreamTesconPlatinumShree Sai DevelopersVictory RealtorsOlive GroupTricityHaware PropertiesGreenscapeZR2 GroupCH2MShapoorji PallonjiNuclear Power Corporation of IndiaSBI CapsBrihanmumbai Municipal CorporationPanvel Municipal CorporationMaharashtra Jeevan PradhikaranWalchandnagar IndustriesTATA ChemicalsEgisColtAdlabs EntertainmentHindustan Dorr-OliverMacleodsAllcargo LogisticsKalpataruBhagwati GroupAksharParadise GroupSatyamURCCSt RegisJanathaAkzoNobelSheltonKesarChaitanya DevelopersBalajiBhairaav GroupArham DevelopersVishwagreenVarsha GroupPratik GardenMayuresh SquareK Raheja ConstructionsSBI Capital MarketsMaharashtra Jal Jeevan MissionNahar Group

Civil EPC in Uran? Start with the file in front of you.

One conversation to screen your project and map the route to grant.