Across roughly 10,000 square metres of landscape and plantation at TCS Banyan Park, KIPL designed and installed a drip-irrigation network built for optimum distribution and sustainable water use: pipeline, system and testing, completed inside forty-five days.

The brief

A mature corporate landscape needs water delivered precisely: enough to keep planting healthy, never more than the site can justify. The mandate was to bring efficient drip irrigation across roughly 10,000 square metres of landscape and plantation zones, engineered for optimum distribution and sustainable usage.

The work had to be systematic and quick: pipeline laying, the irrigation network and operational testing, all closed inside a forty-five-day window without disrupting a working campus.

~10,000 m²

Landscape & plantation on drip irrigation

What KIPL executed

System design
A drip-irrigation system designed for optimum water distribution and sustainable usage across the site.
Pipeline laying
The pipeline network laid across landscape and plantation zones.
Network setup
The irrigation network built out and integrated across the campus landscape.
Operational testing
Full operational testing to prove distribution before handover.

45 days, start to tested

  1. 01DesignDrip system engineered for optimum, sustainable water distribution.
  2. 02PipelineNetwork pipeline laid across landscape and plantation zones.
  3. 03NetworkIrrigation network assembled and integrated.
  4. 04TestingOperational testing completed. The whole works inside 45 days.

The outcome

The installed network supports healthy landscape maintenance and long-term plantation growth on efficient, sustainable water use, a compact, fast engagement that shows KIPL's green-infrastructure work reaches past planting into the systems that keep planting alive.

~10,000 m²
Under efficient drip irrigation
45 days
Design to tested handover