KESARI INFRABUILD PRIVATE LIMITEDEnvironmental Infrastructure Services

Environmental consultants in ONGC Uran, Uran.

ONGC Uran is the area around ONGC's processing plant, which takes in crude and gas piped ashore from the fields off Mumbai and processes them before they go on to refineries and consumers.The work here is read against this ground, not the city’s average.

Why ONGC Uran

The local ground the work sits on.

Part of
Uran, Mumbai Metropolitan Region
Practices here
Environment Approvals · Environmental and Advisory Services · Urban Ecology and Green Infrastructure Services
Work written for it
6 services, each read against this area's ground

ONGC Uran is the area around ONGC's processing plant, which takes in crude and gas piped ashore from the fields off Mumbai and processes them before they go on to refineries and consumers. The plant's columns, flares and tank farms sit on low land near the creeks, and other energy installations stand in the same belt, including a gas-fired power station and LPG storage. Villages lie close by, many of them fishing and farming communities that predate the plant. Pipelines, access roads and the plant's own township and facilities spread across the area.

The questions around ONGC Uran are those of a hazardous installation beside villages and creeks. Flaring, emissions and noise reach the settlements around it. Storage of flammable liquids and gas raises questions of safety and emergency planning. Pipelines cross creeks and mangroves. Old spills may have left oil in soil or water. And the fishing and farming communities around the plant expect a fair share of what it earns, returned as local investment.

ONGC Uran · Uran

Local means the street, not the pin on the map, and the people who live and work along it.

The work here

What applies in ONGC Uran, and why.

The record

The work, project by project.

Mandate, method and measured outcome, written end to end for every project on this list.

Environment Clearance for a greenfield residential-cum-commercial development under the Pradhan Mantri Awas Yojana, on a 27,612 sq m plot in a residential and commercial zone under PMC jurisdiction.

Read the case study
05 / 08

On the ground

Across Uran, and the belt around it.

ONGC Uran is one part of Uran. Each area below is written for its own ground.

Straight answers

ONGC Uran: common questions.

01Our contractor is adding storage tanks at an Uran installation. Does that need clearance?

Possibly. Storage of hazardous chemicals above certain quantities is a scheduled activity, and adding tanks can change an existing clearance. It turns on the substance, the quantity and the scope of the clearance already held. We check against both before the work begins.

02Our clearance requires ambient monitoring in a nearby village. Who arranges it?

The clearance holder, usually through an accredited laboratory, with the station sited as the conditions require. Access to village land needs agreement with the owner. We arrange the station, sampling and reporting.

03Can trees be planted over or near a buried pipeline?

Not directly over it. Pipeline corridors usually need a clear strip for access and inspection, and roots can damage coatings. Shrubs and grasses may be allowed at the edge. We plan the green belt to respect the pipeline operator's rules.

04Why does our consent renewal need so much monitoring data?

Because the consent was granted on conditions, and renewal is when the regulator checks they were met. Stack, ambient, effluent and waste records show that. Gaps or exceedances without explanation delay renewal. We gather and review the data before filing.

05How would we know if an old leak has reached groundwater near our tanks?

Monitoring wells around the tank farm, sampled regularly for hydrocarbons, show it. If there are none, a few new ones and a round of sampling give a first picture. Soil samples near old spill points help too. We plan and carry out the investigation.

Clients & partners

The work is trusted where the stakes are highest.

Two decades of clearances, treatment plants and green infrastructure delivered for India’s builders, industry and public bodies, and the global engineering firms beside them.

Reliance IndustriesPhoenix MarketcityTata Consultancy ServicesAECOMAirTrunkJacobsAuricAGPPyramid InfratechNeelkanth InfratechJ P InfraPentagon PremisesEmperiaDreamTesconPlatinumShree Sai DevelopersVictory RealtorsOlive GroupTricityHaware PropertiesGreenscapeZR2 GroupCH2MShapoorji PallonjiNuclear Power Corporation of IndiaSBI CapsBrihanmumbai Municipal CorporationPanvel Municipal CorporationMaharashtra Jeevan PradhikaranWalchandnagar IndustriesTATA ChemicalsEgisColtAdlabs EntertainmentHindustan Dorr-OliverMacleodsAllcargo LogisticsKalpataruBhagwati GroupAksharParadise GroupSatyamURCCSt RegisJanathaAkzoNobelSheltonKesarChaitanya DevelopersBalajiBhairaav GroupArham DevelopersVishwagreenVarsha GroupPratik GardenMayuresh SquareK Raheja ConstructionsSBI Capital MarketsMaharashtra Jal Jeevan MissionNahar Group

A project in ONGC Uran? Start with the ground you have.

One conversation to read the site and map what it will need.