A feasibility report answers the question a Tree Authority and a project team both need settled: for each tree, can it be moved, should it be moved, and to where.

What it is

Feasibility is assessed tree by tree against the factors that decide a transplant: species and rooting habit, girth and age, health and structural condition, soil and root spread, machinery access to the tree, and the suitability of the receiving site. Each tree comes out of the assessment classified as retain in place, transplant, or remove with compensatory plantation, with the reasoning recorded rather than asserted.

KIPL prepares the report to support both the application and the construction programme. It states the preparation lead time each transplant needs, the equipment and access implied, the receiving site proposed for each tree, and an honest view of risk: because a report that recommends transplanting every tree is not credible, and one that recommends felling every tree will not be accepted.

tree transplant

What you get

The deliverables, in hand.

Authority
Tree Authority submission · arboricultural assessment
Typical timeline
One to three weeks after enumeration
  • Tree-wise assessment against species, girth, age, health and rooting habit
  • Machinery access and site-constraint evaluation per tree
  • Receiving site evaluation: soil, drainage, space and water
  • Classification: retain, transplant, or remove with compensation
  • Preparation lead time, method and equipment requirement
  • Feasibility report suitable for submission with the Tree Authority application

Straight answers

Transplantation Feasibility Assessment: common questions.

01What does a transplant feasibility report contain?

A tree-wise assessment covering species, girth, age, health, rooting habit, access for machinery and the proposed receiving site, ending in a recommendation for each tree: retain, transplant or remove. It also states the preparation lead time and method for the trees recommended for moving.

02Why is feasibility assessed before applying for permission?

Because Tree Authorities increasingly expect transplantation to have been examined before felling is sought, and because the construction programme depends on the answer. A feasibility report filed with the application makes the case concrete rather than a general assurance that transplantation was considered.

03What makes a tree a poor transplant candidate?

Very large girth relative to what can be lifted, advanced age, a deep tap root, disease or structural decay, heavy root entanglement with foundations or services, and no machinery access. Any of these can make a move technically possible but so unlikely to succeed that felling with compensatory plantation is the more honest recommendation.

04Can the receiving site be decided later?

It should not be. The receiving site governs whether the move is worth attempting at all: its soil, drainage, space, water and tenure. A feasibility report that recommends transplantation without naming and assessing a receiving location has left out the part that most often decides the outcome.

05Does the report guarantee survival?

No. It assesses probability against known factors and identifies the conditions on which survival depends: preparation, season, root-ball size, aftercare. Any guarantee of survival for a mature tree move should be treated with caution; what can be committed to is method, preparation and aftercare.

06How does this fit with the tree census?

The census is the factual inventory: number, species, girth, condition, position. Feasibility is the judgement layer on top of it. Enumeration comes first, feasibility follows, and the two together form the technical basis of the application to the Tree Authority.

Relevant proof

Where this stage has already been delivered.

A dirt path running between dense young Miyawaki forest

MCGM · Eastern Suburbs, Mumbai

MCGM GARDEN DEVELOPMENT- MIYAWAKI PLANTATION

Miyawaki dense forestation across 27 locations in 7 wards using native species, delivered under the municipal greening programme.

~74,000 m²Area
≈1,10,000Trees
2,052 tCO₂ (est.)
See the full case →

Where we do this

Tree Management on the ground.

The authority, the timeline and the local ground differ by city. These pages set out how tree management actually runs in each.

Full coverage →

Our expertise

One team across the whole environmental brief.

Transplantation Feasibility Assessment is one stage of one practice. Most projects need several, and the commitments made at clearance are the ones we build and maintain.

All expertise →

Who we do this for

Tree Management reads differently by industry.

Trusted by

The organisations this work is done for.

Panvel Municipal CorporationURCCPhoenix MarketcityEgisBrihanmumbai Municipal Corporation

Bring us the transplantation feasibility assessment, or the whole clearance.