KESARI INFRABUILD PRIVATE LIMITEDEnvironmental Infrastructure Services

ESG Advisory & Reporting consultants in Bhiwandi.

ESG Advisory & Reporting in Bhiwandi, on the ground where the work actually is, the warehousing belt along the Mumbai–Nashik highway and the powerloom and sizing units of the old town, carried by one accredited team, from the first baseline to the signed-off report.

Why Bhiwandi

The local ground esg advisory & reporting sits on.

Decided with
MPCB Thane · BNCMC · MMRDA · SEIAA Maharashtra · CPCB (EPR) · SEBI (BRSR)
Local ground
The Kasheli–Kalher–Purna–Val warehousing belt along the Mumbai–Nashik highway, Anjur Phata and the powerloom wards of the old town
Typically for
Listed companies and their supply-chain vendors

Bhiwandi's compliance work runs on two clocks. The old town keeps one: powerlooms, sizing and processing units packed into narrow lanes, many run by families who have held the same sheds for decades, on consents that are easy to let lapse. Out along the Mumbai–Nashik highway, in Kasheli, Kalher, Purna and Val, the warehousing belt keeps another: large parks built fast, let to logistics firms and online sellers, and bought by investors who expect the paperwork to match the ground. Both answer to MPCB, and both are judged on their records first.

ESG requests reach Bhiwandi from two directions. Retailers, e-commerce firms and 3PLs leasing space here report their own emissions and ask landlords for metered energy, solar generation and refrigerant data. Textile units in the old town supply garment brands whose buyer codes ask about water, chemicals and working conditions. We work out what each customer actually needs, build the figures from bills, meters and records already held, and prepare the BRSR input, footprint or questionnaire that answers it. The work is carried from our base in the region by named people, start to finish, not passed down a chain.

ESG Advisory & Reporting · Bhiwandi

The disclosure mandate starts at the top of the pyramid. The data demand runs all the way down it.

Local demand

What drives esg advisory & reporting in Bhiwandi.

The second driver is the older textile economy. Bhiwandi remains one of India's largest powerloom centres, and around the looms sit sizing, dyeing and processing units that run boilers and use water. These are the units MPCB watches for smoke and effluent, and the Board can and does direct units to close when conditions are ignored. Many owners hold consents written for a smaller operation, a different fuel or an older process. Garment brands buying from the cluster add their own supplier codes on chemicals, water and energy. Compliance here is about keeping a working unit open.

Warehouses are where much of a retailer's value-chain footprint becomes physical: trucks idling at docks, cold chains, forklifts, packaging. Occupiers in Bhiwandi have begun asking for electric-vehicle charging, rooftop solar and waste segregation as part of the lease, and some landlords answer with green lease clauses that share data both ways. In the old town, textile exporters face questions from brands whose own buyers want to know more about their suppliers. Each needs data it can collect every year.

How it works

ESG Advisory & Reporting, from baseline to sign-off.

The full service →
  1. 01/04

    Materiality

    The ESG issues that actually matter to this business and its stakeholders.

  2. 02/04

    Measurement

    Carbon footprint and the metrics the chosen framework requires, measured properly.

  3. 03/04

    Reporting

    BRSR, GRI or CDP disclosure, assembled to survive scrutiny.

  4. 04/04

    Roadmap

    A net-zero roadmap and the value-chain data flow to sustain it.

Proof

Comparable work we've delivered.

carbon-footprint dashboard and a BRSR report shown on a laptop and printed sprea

MIDC / AURIC · Shendra & Bidkin, Chhatrapati Sambhajinagar

SHENDRA AND BIDKIN INDUSTRIAL AREA, AURANGABAD

Environmental compliance audits, Consent to Establish and green certification support across two industrial nodes of the Delhi-Mumbai Industrial Corridor.

4,024 haShendra + Bidkin
IGBC GoldCity scale
See the full case →

The record

The work, project by project.

Mandate, method and measured outcome, written end to end for every project on this list.

Green zone development and maintenance across multiple client sites at Jamnagar, covering 120 acres. The wider Jamnagar portfolio also included Miyawaki plantation and maintenance of approximately 80,000 plants across 24,000 sq m.

Read the case study
05 / 08

On the ground

Across Bhiwandi, and the belt around it.

Local means the node, not the pin on the map. We carry esg advisory & reporting across the Bhiwandi nodes and the wider Mumbai Metropolitan Region: where the units, plots and projects actually sit.

Straight answers

ESG Advisory & Reporting in Bhiwandi: common questions.

01Our powerloom unit supplies a garment exporter who wants our energy figures. What do we send?

Start with electricity bills for the looms, fuel records for any boiler or generator, and your monthly production in metres or kilograms. From these we work out energy per unit of cloth, the figure buyers usually want: and note how it was calculated. It is simple, it repeats each year, and it holds up when the exporter's auditor asks.

02An investor is buying our warehouse park. What environmental papers will they ask for?

Usually the environment clearance where the built-up area required one, consents to establish and operate for each phase, the compliance reports filed since, drainage approvals and any notices received. Gaps between phases are common in Bhiwandi. We assemble the file, note what is missing, and close what can be closed before the buyer's diligence begins.

03How long does esg advisory & reporting take in Bhiwandi, and who is involved?

MPCB Thane · BNCMC · MMRDA · SEIAA Maharashtra · CPCB (EPR) · SEBI (BRSR) are the bodies a Bhiwandi project works with. On timing: reporting-cycle driven; strategy ongoing. KIPL sets out a realistic Bhiwandi schedule once the site and the scope have been read, and carries the work through to the outcome, with comparable work on the record such as SHENDRA AND BIDKIN INDUSTRIAL AREA, AURANGABAD.

By industry

The same filing, read for your sector.

Clients & partners

The work is trusted where the stakes are highest.

Two decades of clearances, treatment plants and green infrastructure delivered for India’s builders, industry and public bodies, and the global engineering firms beside them.

Reliance IndustriesPhoenix MarketcityTata Consultancy ServicesAECOMAirTrunkJacobsAuricAGPPyramid InfratechNeelkanth InfratechJ P InfraPentagon PremisesEmperiaDreamTesconPlatinumShree Sai DevelopersVictory RealtorsOlive GroupTricityHaware PropertiesGreenscapeZR2 GroupCH2MShapoorji PallonjiNuclear Power Corporation of IndiaSBI CapsBrihanmumbai Municipal CorporationPanvel Municipal CorporationMaharashtra Jeevan PradhikaranWalchandnagar IndustriesTATA ChemicalsEgisColtAdlabs EntertainmentHindustan Dorr-OliverMacleodsAllcargo LogisticsKalpataruBhagwati GroupAksharParadise GroupSatyamURCCSt RegisJanathaAkzoNobelSheltonKesarChaitanya DevelopersBalajiBhairaav GroupArham DevelopersVishwagreenVarsha GroupPratik GardenMayuresh SquareK Raheja ConstructionsSBI Capital MarketsMaharashtra Jal Jeevan MissionNahar Group

ESG Advisory & Reporting in Bhiwandi? Start with where the project stands today.

One conversation to read the obligations in front of you and map what it takes to meet them.