KESARI INFRABUILD PRIVATE LIMITEDEnvironmental Infrastructure Services

Environment Management & Mitigation Plan consultants in Pune.

Environment Management & Mitigation Plan in Pune, on the ground where the work actually is, the Hinjawadi and Kharadi office belts and the Chakan–Ranjangaon supplier plants, carried by one accredited team, from the first baseline to the signed-off report.

Why Pune

The local ground environment management & mitigation plan sits on.

Decided with
MPCB Pune regional office · SEBI (BRSR) · CPCB (EPR) · SEIAA Maharashtra
Local ground
The Hinjawadi and Kharadi office belts and the Chakan, Talegaon, Ranjangaon and Bhosari MIDC estates
Typically for
Any project with EC or consent EMP conditions

Pune's advisory work runs along two lines that meet. One is the office economy: the IT campuses of Hinjawadi and Kharadi, Magarpatta and the business parks of Viman Nagar, occupied by firms that answer to global owners and listed parents. The other is the plant floor: auto, engineering and component makers across Chakan, Talegaon, Ranjangaon and Bhosari, most of them suppliers to someone who now asks for evidence. Between them sit the townships of the city's edge, built to rating systems and bound by clearance conditions that outlast the handover.

An EMP in Pune has to reckon with the terrain. Township and campus sites on the city's edges often sit on sloping basalt ground, where monsoon runoff, cut-and-fill and topsoil loss are the first risks to manage. Water is the second, many projects on the PMRDA fringe rely on tankers and borewells until municipal supply arrives, so the plan must account for every source. A useful EMP names who on site controls silt fencing, dust suppression and water meters, and what they report each month. The work is carried from our base in the region by named people, start to finish, not passed down a chain.

Environment Management & Mitigation Plan · Pune

A management plan the site can't execute is just paper. We write the one they can.

Local demand

What drives environment management & mitigation plan in Pune.

The second is the built estate. Office parks in Hinjawadi and Kharadi compete for tenants who ask about ratings, energy and water before they sign. Township projects in Wagholi, Hinjawadi and along the PMRDA fringe carry clearance conditions: an EMP to follow, compliance reports to file every six months, a CER commitment to spend. Pune's summers now test its water supply, and a building's water and energy figures have become a question residents ask directly. Advisory work here is less about the first approval than about what a building or a plant must prove every year after it.

EMP work in Pune follows the construction cycle. Township and large housing projects across the PMRDA area carry EC conditions on dust, construction waste, topsoil, water and traffic, and must file six-monthly compliance reports showing those conditions met. Pune's air in the dry months has put construction dust under closer watch, and the Construction and Demolition Waste Management Rules, 2016 expect debris to go for proper processing. A plan that site engineers can actually follow is how a developer shows this is being done.

How it works

Environment Management & Mitigation Plan, from baseline to sign-off.

The full service →
  1. 01/04

    EMP preparation

    The management plan derived from the EIA and the clearance conditions.

  2. 02/04

    Mitigation plan

    Each impact met with a costed, assigned mitigation measure.

  3. 03/04

    Risk management

    Environmental risks identified, ranked and controlled.

  4. 04/04

    EHS reporting

    The reporting that demonstrates the plan is being implemented.

Proof

Comparable work we've delivered.

EHS officer giving a toolbox environmental and safety briefing to a construction

KwaliChem Pvt. Ltd. · TTC Industrial Area, Rabale, Navi Mumbai

EIA for Synthetic Organic Chemical Industry

CTE/CTO application, ToR application, baseline data collection, EIA report and appraisal before the EAC: Category 5(f), the sector KIPL holds Category A accreditation in.

20 → 140 TPMCapacity
Cat A5(f) accredited
See the full case →

The record

The work, project by project.

Mandate, method and measured outcome, written end to end for every project on this list.

The Mayor's residence for the Panvel Municipal Corporation, built from concept to completion: columned elevations, terraces, landscape, external works and architectural lighting.

Read the case study
05 / 08

On the ground

Across Pune, and the belt around it.

Local means the node, not the pin on the map. We carry environment management & mitigation plan across the Pune nodes and the wider Western Maharashtra: where the units, plots and projects actually sit.

Straight answers

Environment Management & Mitigation Plan in Pune: common questions.

01What does an EMP for a Pune township need to cover while construction is under way?

At minimum: dust control on haul roads and stockpiles, silt control before the monsoon, topsoil stored for reuse, debris sent to authorised processing, water use metered by source, and noise limits near occupied phases. Where earlier phases already have residents, the plan must also protect them from the works next door. We assign each measure to a named site role.

02Does a Pune office campus or housing project gain anything from an IGBC or GRIHA rating?

Usually, yes. Depending on the scheme in force, a rating can bring planning or property-tax incentives, and many corporate tenants in Hinjawadi and Kharadi now ask for one as part of their own reporting. The larger gain is often in running costs, lower energy and water bills for the life of the building. We assess which rating fits before the design freezes.

03How long does environment management & mitigation plan take in Pune, and who is involved?

MPCB Pune regional office · SEBI (BRSR) · CPCB (EPR) · SEIAA Maharashtra are the bodies a Pune project works with. On timing: prepared at EIA; implemented for project life. KIPL sets out a realistic Pune schedule once the site and the scope have been read, and carries the work through to the outcome, with comparable work on the record such as EIA for Synthetic Organic Chemical Industry.

By industry

The same filing, read for your sector.

Clients & partners

The work is trusted where the stakes are highest.

Two decades of clearances, treatment plants and green infrastructure delivered for India’s builders, industry and public bodies, and the global engineering firms beside them.

Reliance IndustriesPhoenix MarketcityTata Consultancy ServicesAECOMAirTrunkJacobsAuricAGPPyramid InfratechNeelkanth InfratechJ P InfraPentagon PremisesEmperiaDreamTesconPlatinumShree Sai DevelopersVictory RealtorsOlive GroupTricityHaware PropertiesGreenscapeZR2 GroupCH2MShapoorji PallonjiNuclear Power Corporation of IndiaSBI CapsBrihanmumbai Municipal CorporationPanvel Municipal CorporationMaharashtra Jeevan PradhikaranWalchandnagar IndustriesTATA ChemicalsEgisColtAdlabs EntertainmentHindustan Dorr-OliverMacleodsAllcargo LogisticsKalpataruBhagwati GroupAksharParadise GroupSatyamURCCSt RegisJanathaAkzoNobelSheltonKesarChaitanya DevelopersBalajiBhairaav GroupArham DevelopersVishwagreenVarsha GroupPratik GardenMayuresh SquareK Raheja ConstructionsSBI Capital MarketsMaharashtra Jal Jeevan MissionNahar Group

Environment Management & Mitigation Plan in Pune? Start with where the project stands today.

One conversation to read the obligations in front of you and map what it takes to meet them.