KESARI INFRABUILD PRIVATE LIMITEDEnvironmental Infrastructure Services
Back to projects

Environment Clearance · public housing

Panvel Municipal Corporation: Environment Clearance for a PMAY residential and commercial development

Aerial rendering of the PMAY development at Panvel: two rows of mid-rise residential blocks in white, green and terracotta around an internal road, with the existing town beyond

01 03

Location
Plot Nos. 508/A, 508/C, 508/D, 508/E, 508/F and 508/G/5, Kacchi Mohalla, Panvel
Market
Real Estate & Construction
Client
M/s. Panvel Municipal Corporation
Practice
Environmental Approvals

A greenfield residential-cum-commercial development under the Pradhan Mantri Awas Yojana, promoted by Panvel Municipal Corporation itself: 27,612 square metres of plot, 82,283 square metres of construction, and an Environment Clearance to be secured before any of it could start.

The brief

Public housing carries a constraint private development does not: the promoter is the same body that administers the area, so the clearance has to be unimpeachable. Panvel Municipal Corporation is both the applicant here and the planning authority for the jurisdiction the project sits in, and an application that looked thin would be read in that light.

The scheme is greenfield: 27,612 square metres of plot in a residential and commercial zone, carrying 82,283 square metres of construction. At that built-up area the project needs Environment Clearance before work starts, and the application has to establish the baseline, the demands the development will place on water, sewage, solid waste and traffic, and the measures that will hold them.

82,283 m²

Construction area requiring clearance

What KIPL executed

Application preparation
The Environment Clearance application for the development, on the stated plot and net plot areas.
Area computation
FSI, non-FSI and total construction areas established and reconciled with the development plan.
Zoning confirmation
The proposal checked against the development plan, which places it in a residential and commercial zone.
Greenfield baseline
Baseline established for a site with no prior development to inherit.
Regulatory submission
Submission and follow-through with the authority.

The facility

Total plot area
27,612.26 sq m
Net plot area
26,231.65 sq m
Proposed FSI area
74,106.6 sq m
Non-FSI area
8,176.4 sq m
Total construction area
82,283 sq m
Project type
Greenfield

The outcome

An Environment Clearance application prepared and submitted for a PMAY development of 82,283 square metres, public housing whose approval is a precondition of the homes being built at all.

27,612 m²
Total plot area
82,283 m²
Total construction area
PMAY
Under the national housing mission