The Solid Waste Management Rules 2016 place the duty to collect, process and dispose of municipal waste on the local body itself, which makes processing capacity a statutory obligation of the corporation rather than a service it can outsource the responsibility for.
Screening view on your project, with the category and route named. No obligation.
What this means for municipal corporations
Rule 15 of the SWM Rules 2016 makes the local authority responsible for segregated collection, processing and scientific disposal, for setting up facilities, for enforcing the bulk generator obligation on its own societies and institutions, and for investigating and rehabilitating old dumpsites. Each of those is a separate procurement with a separate regulatory instrument attached: a processing or disposal facility of the notified description is a listed activity at item 7(i) of the Schedule to the EIA Notification 2006 and needs Environment Clearance in the corporation's own name, it needs authorisation from MPCB under the Rules, and it needs consent under the Water and Air Acts. Legacy waste at a dumpsite is a separate exercise again.
How KIPL runs it
KIPL works with corporations on the full chain rather than a single facility, because the failure at civic scale is almost always one of sequencing, a processing facility commissioned before segregation at source is enforced receives mixed waste and underperforms against its own design, and the shortfall is then reported as a facility failure. We prepare the clearance and consent files, specify facilities against the waste actually characterised for that city, and set the monitoring that the corporation will be asked to produce, whether by the pollution control board, the Tribunal or a resident.
- SWM Rules 2016
The processing duty is the local authority's own
Rule 15 places collection, processing, disposal and facility development squarely on the local body, along with enforcing segregation and the bulk generator obligation. A contractor can perform the work; the duty does not move.
- EIA Notification 2006, item 7(i)
The facility needs its own Environment Clearance
A common municipal solid waste management facility is a listed activity, so the corporation is the proponent in an EC process, with all the appraisal and public consultation exposure that implies.
- NGT, OA 606/2018
Continuing accountability for waste management
The Tribunal's continuing proceedings on compliance with the SWM Rules have kept processing gaps, legacy dumpsites and unscientific disposal under monitoring, with environmental compensation assessed against States and local bodies.
What you receive
Written for municipal corporations, not adapted from a template.
- 01Waste characterisation and quantification for the city, by ward and by stream
- 02Processing capacity plan (decentralised, ward-level and centralised) matched to characterised waste
- 03Environment Clearance file for the facility under item 7(i), with the corporation as proponent
- 04Authorisation under the SWM Rules 2016 and consent under the Water and Air Acts for each facility
- 05Legacy waste assessment and bio-mining or bio-remediation plan for old dumpsites
- 06Rule 15 compliance and reporting framework, structured for board and Tribunal reporting
Questions from municipal corporations
What municipal corporations ask before appointing us.
Answered against the regulation as it stands, not as a sales pitch. If your situation is not here, ask us directly.
Ask a question →Does a municipal waste processing facility need Environment Clearance?
A common municipal solid waste management facility of the notified description is a listed activity at item 7(i) of the Schedule to the EIA Notification 2006, so Environment Clearance arises and the corporation is the proponent. In addition, the facility needs authorisation under the Solid Waste Management Rules 2016 and consent under the Water Act 1974 and the Air Act 1981. Which of these apply to a particular facility depends on its type and scale, and should be screened before the site is finalised.
Can the corporation transfer its Rule 15 duties to a concessionaire?
It can transfer the work but not the duty. Rule 15 places the responsibility on the local authority, and regulatory action for a processing shortfall or an unscientific disposal site is taken against the corporation. The concession agreement should therefore mirror the regulatory obligations precisely, including tonnage, quality of processing, monitoring and record retention.
Why does a new processing plant underperform in the first year?
Usually because segregation at source has not been achieved, so the plant receives mixed waste it was not designed for. Compost quality falls, rejects rise and the disposal load does not reduce as projected. Segregation enforcement, including the bulk generator obligation, has to run ahead of or alongside the facility, not after it.
What is required for legacy waste at an old dumpsite?
The SWM Rules 2016 require old and abandoned dump sites to be investigated and rehabilitated. In practice this means characterising the deposited waste, assessing leachate and gas, selecting between bio-mining, bio-remediation and capping, and settling the disposal or utilisation route for each recovered fraction before the contract is tendered. Reclaimed land use also has to be decided early, since it governs the closure standard.
How does the bulk generator obligation help the corporation?
It moves a substantial part of the biodegradable load off the municipal system. The SWM Rules 2016 require bulk waste generators to segregate and process biodegradable waste on their own premises, and the local authority enforces this through its bye-laws. Enforcing it reduces the tonnage the corporation has to transport and process, which is usually cheaper than adding centralised capacity.
What do we have to be able to show at any time?
Tonnage collected and processed, segregation performance, the status of each facility's authorisation and consent, leachate and gas monitoring for disposal sites, and the position on legacy waste. That set is what is asked for in Tribunal and board reporting, and a corporation that maintains it continuously answers in days rather than commissioning an emergency study.
Stage by stage
How integrated solid waste management actually runs, step by step.
Also for municipal corporations
The rest of the environmental brief for this sector.

Relevant proof
SHENDRA AND BIDKIN INDUSTRIAL AREA, AURANGABAD
Environmental compliance audits, Consent to Establish and green certification support across two industrial nodes of the Delhi-Mumbai Industrial Corridor.
- Shendra + Bidkin
- 4,024 ha
- City scale
- IGBC Gold
Where we do this
Integrated Solid Waste Management for municipal corporations, city by city.
Other sectors
Who else we run integrated solid waste management for.
Next step
Tell us the project, and we will tell you the category and the route.
Screening is the cheapest stage to get right and the most expensive to get wrong. We will say plainly what integrated solid waste management your municipal corporations project needs, and what it does not.





























































Start the conversation