KESARI INFRABUILD PRIVATE LIMITEDEnvironmental Infrastructure Services

Environment Management & Mitigation Plan consultants in Hyderabad.

Environment Management & Mitigation Plan in Hyderabad, on the ground where the work actually is, the HITEC City–Financial District office belt and the bulk-drug plants of Genome Valley and Patancheru–Bollaram, carried by one accredited team, from the first baseline to the signed-off report.

Why Hyderabad

The local ground environment management & mitigation plan sits on.

Decided with
TGPCB · SEIAA Telangana · CPCB (EPR) · SEBI (BRSR) · HMDA / GHMC
Local ground
The HITEC City, Gachibowli and Financial District office belt, Genome Valley, and the Patancheru, Bollaram, Pashamylaram and Jeedimetla industrial areas
Typically for
Any project with EC or consent EMP conditions

Hyderabad's advisory ground is split between two economies that rarely meet. In the west, HITEC City, Madhapur, Gachibowli and the Financial District at Nanakramguda hold software firms, global capability centres and a spreading cluster of data centres, most answering to owners and investors abroad. To the north and north-west lies a pharmaceutical base of national weight: bulk-drug and intermediate plants in the estates of Patancheru, Bollaram, Pashamylaram and Jeedimetla, with research and biotech campuses at Genome Valley near Shamirpet. Both answer to TGPCB. Only one of them has a long history with it.

A management plan in Hyderabad must deal with rock. Much of the western city stands on granite, and sites in Kokapet, Narsingi and the Financial District often need blasting or rock breaking, which brings dust, vibration and complaints from neighbours. Many plots sit beside a lake or the nala that links one lake to the next, and both must be shielded from silt and spoil. Water use is closely watched, since each litre of city supply has travelled a long way. The plan names who controls each risk on site. The team travels from its base in Navi Mumbai and stays named on the work, start to finish, not passed down a chain.

Environment Management & Mitigation Plan · Hyderabad

A management plan the site can't execute is just paper. We write the one they can.

Local demand

What drives environment management & mitigation plan in Hyderabad.

The western office belt brings a different load. Towers in the Financial District, Kokapet and Gachibowli rise on granite and on land that once drained into lakes, and the bigger campuses cross the size at which SEIAA Telangana must grant environment clearance. Hyderabad's drinking water is lifted and piped over long distances from the Krishna and Godavari, and building has swallowed many of its lakes. Listed firms report under SEBI's BRSR rules; capability centres feed parents' climate disclosures. Water, energy and land use sit at the centre of both.

EMP work in Hyderabad follows the western building boom. High-rise housing and office projects in Kokapet, Narsingi, Tellapur and the Financial District hold EC conditions covering dust, spoil, water and traffic, with a report on each of them every half-year. The October 2020 floods exposed the cost of blocked nalas and lakes, and the city has since acted against encroachment on lake beds and buffers. Residents in nearby towers watch blasting and dust closely. A plan the crew on site actually uses is the developer's answer.

How it works

Environment Management & Mitigation Plan, from baseline to sign-off.

The full service →
  1. 01/04

    EMP preparation

    The management plan derived from the EIA and the clearance conditions.

  2. 02/04

    Mitigation plan

    Each impact met with a costed, assigned mitigation measure.

  3. 03/04

    Risk management

    Environmental risks identified, ranked and controlled.

  4. 04/04

    EHS reporting

    The reporting that demonstrates the plan is being implemented.

Proof

Comparable work we've delivered.

EHS officer giving a toolbox environmental and safety briefing to a construction

KwaliChem Pvt. Ltd. · TTC Industrial Area, Rabale, Navi Mumbai

EIA for Synthetic Organic Chemical Industry

CTE/CTO application, ToR application, baseline data collection, EIA report and appraisal before the EAC: Category 5(f), the sector KIPL holds Category A accreditation in.

20 → 140 TPMCapacity
Cat A5(f) accredited
See the full case →

The record

The work, project by project.

Mandate, method and measured outcome, written end to end for every project on this list.

Category B1 under Schedule 8(b): EIA and EMP prepared and carried through SEIAA appraisal for the expansion at Nerul.

Read the case study
05 / 08

On the ground

Across Hyderabad, and the belt around it.

Local means the node, not the pin on the map. We carry environment management & mitigation plan across the Hyderabad nodes and the wider Hyderabad Metropolitan Region: where the units, plots and projects actually sit.

Straight answers

Environment Management & Mitigation Plan in Hyderabad: common questions.

01What goes into an EMP for a Kokapet project that needs blasting?

Controlled blasting with limits on charge and timing, vibration and noise readings at the nearest buildings, dust suppression during rock breaking and haulage, silt traps ready before June, and spoil taken to authorised processors. Where a lake or nala is nearby, runoff is settled before it leaves the site. A named engineer answers for each measure.

02Our site in Gachibowli is near a lake. Does that affect what we can build?

Very likely. Hyderabad's lakes carry a full tank level and a buffer zone in which building is restricted, and the city has recently demolished structures found inside them. The lake's notified boundary and buffer must be checked against your plot before design, and site drainage must not run into it untreated. We read the plot against the lake records first.

03How long does environment management & mitigation plan take in Hyderabad, and who is involved?

TGPCB · SEIAA Telangana · CPCB (EPR) · SEBI (BRSR) · HMDA / GHMC are the bodies a Hyderabad project works with. On timing: prepared at EIA; implemented for project life. KIPL sets out a realistic Hyderabad schedule once the site and the scope have been read, and carries the work through to the outcome, with comparable work on the record such as EIA for Synthetic Organic Chemical Industry.

By industry

The same filing, read for your sector.

Clients & partners

The work is trusted where the stakes are highest.

Two decades of clearances, treatment plants and green infrastructure delivered for India’s builders, industry and public bodies, and the global engineering firms beside them.

Reliance IndustriesPhoenix MarketcityTata Consultancy ServicesAECOMAirTrunkJacobsAuricAGPPyramid InfratechNeelkanth InfratechJ P InfraPentagon PremisesEmperiaDreamTesconPlatinumShree Sai DevelopersVictory RealtorsOlive GroupTricityHaware PropertiesGreenscapeZR2 GroupCH2MShapoorji PallonjiNuclear Power Corporation of IndiaSBI CapsBrihanmumbai Municipal CorporationPanvel Municipal CorporationMaharashtra Jeevan PradhikaranWalchandnagar IndustriesTATA ChemicalsEgisColtAdlabs EntertainmentHindustan Dorr-OliverMacleodsAllcargo LogisticsKalpataruBhagwati GroupAksharParadise GroupSatyamURCCSt RegisJanathaAkzoNobelSheltonKesarChaitanya DevelopersBalajiBhairaav GroupArham DevelopersVishwagreenVarsha GroupPratik GardenMayuresh SquareK Raheja ConstructionsSBI Capital MarketsMaharashtra Jal Jeevan MissionNahar Group

Environment Management & Mitigation Plan in Hyderabad? Start with where the project stands today.

One conversation to read the obligations in front of you and map what it takes to meet them.