Water Balance Study: proving how much groundwater a project actually needs.

A water balance study accounts for every stream of water into and out of a project, so that the groundwater abstraction applied for is the quantity genuinely required after alternative sources and reuse are taken into account.

What it is

The Central Ground Water Authority grants a No Objection Certificate for a stated quantum of abstraction, and it expects that quantum to be justified rather than asserted. A water balance study sets out demand by end use (process, cooling, boiler, domestic, horticulture, firefighting) against sources, including municipal or canal supply, surface water, treated effluent reused, harvested rainwater and groundwater. It closes the loop on the discharge side through effluent generated, evaporation and treated water recycled, and it identifies where the groundwater component can legitimately be reduced.

KIPL prepares the balance from design and metered data, keeping it consistent with the figures used elsewhere in the regulatory file: the consent application, the Environment Clearance documents and the hydrogeological report all draw on the same numbers, and a mismatch between them is the fastest way to a query. Where the balance shows that reuse or an alternative source can displace part of the demand, that is a stronger application than one seeking the maximum, because the abstraction sought is then defensible on the face of the study.

gloved hands collecting a water sample into a labelled bottle from a stream

What you get

The deliverables, in hand.

Authority
CGWA guidelines · aligned with consent and EC documentation
Typical timeline
Days to weeks, depending on the availability of design and metered data
  • End-use water demand schedule for construction and operation phases
  • Source-wise allocation including surface, municipal, recycled and harvested water
  • Wastewater generation, treatment and reuse quantification
  • Closed water balance diagram with losses and discharge accounted
  • Net groundwater abstraction justified for the NOC application
  • Reduction and reuse measures identified with their effect on the balance

Straight answers

Water Balance Study: common questions.

01What is a water balance study?

It is a quantified account of all water entering and leaving a project: demand by end use, supply by source, wastewater generated, water recycled and water discharged or lost. It closes arithmetically, so that every unit of water is accounted for, and it establishes the net groundwater requirement.

02Why does CGWA need it?

Because the NOC is granted for a specified abstraction quantum. Without a balance, the figure applied for is an assertion. The study demonstrates that the demand is real, that alternative sources and reuse have been applied first, and that the groundwater component is what genuinely remains.

03How does it differ from the hydrogeological report?

The water balance answers how much water the project needs and why. The hydrogeological report answers whether the aquifer can sustainably supply it and what the impact of doing so will be. One is a demand-side document, the other resource-side, and the abstraction figure must be identical in both.

04Does recycling reduce the abstraction that can be sought?

It reduces the abstraction that needs to be sought, which strengthens the application. Where a project treats and reuses effluent, harvests rainwater or takes part of its supply from a surface or municipal source, the net groundwater demand falls, and an NOC for a smaller quantum in a stressed area is materially easier to justify.

05Is a water balance also used outside the CGWA application?

Yes. The same balance underpins the water and effluent figures in an MPCB consent application and in Environment Clearance documentation, and it informs zero liquid discharge or reuse commitments. Preparing it once, consistently, avoids the contradictions between filings that regulators notice.

06What data does the study need?

Process design and specific water consumption, headcount and domestic demand, cooling and boiler make-up, landscaping area, effluent generation and treatment plant capacity and recovery, rainfall and catchment area for harvesting, and metered consumption where the site is already operating. Where design data is provisional, the assumptions should be stated rather than concealed.

07What if actual consumption later exceeds the balance?

The NOC permits a stated quantum, and drawing beyond it is a breach of its conditions. If demand genuinely grows, the correct route is a revised balance and an application to enhance the permitted abstraction, not quiet over-drawing, which will show up in metering and water level reporting obligations attached to the NOC.

Primary sources

Check it at source.

This page describes CGWA guidelines · aligned with consent and EC documentation. The regulation and the filing portal are public, these are the official endpoints, not our summary of them.

Relevant proof

Where this stage has already been delivered.

Ghats along the Ganga, with boats moored at the riverfront

Shapoorji Pallonji · Kanpur & Unnao, Uttar Pradesh

NAMAMI GANGE PROGRAMME

Environmental & Social Impact Assessment and EHS reporting for existing and proposed sewage treatment plants on the Ganga.

130 MLDLargest existing STP
5 plantsAssessed
See the full case →

Where we do this

CGWA Groundwater NOC on the ground.

The authority, the timeline and the local ground differ by city. These pages set out how cgwa groundwater noc actually runs in each.

Full coverage →

Our expertise

One team across the whole environmental brief.

Water Balance Study is one stage of one practice. Most projects need several, and the commitments made at clearance are the ones we build and maintain.

All expertise →

Who we do this for

CGWA Groundwater NOC reads differently by industry.

Trusted by

The organisations this work is done for.

Panvel Municipal CorporationPyramid InfratechNeelkanth InfratechSatyamJ P InfraPentagon PremisesBhagwati GroupEmperiaDreamTesconPlatinumShree Sai DevelopersVictory RealtorsOlive GroupTricity

Bring us the water balance study, or the whole clearance.