Rainwater Harvesting Plan: the recharge commitment attached to a groundwater NOC.
A rainwater harvesting and artificial recharge plan is the measure a groundwater user commits to in return for permission to abstract, and it is designed from catchment and runoff rather than from a standard drawing.
What it is
The Central Ground Water Authority requires groundwater users to implement rainwater harvesting and artificial recharge as a condition of the No Objection Certificate, and many State and municipal building regulations impose a parallel requirement on plots above a stated size. A workable plan begins with the catchment (rooftop, paved and open areas separately) applies appropriate runoff coefficients to local rainfall, and derives the volume available. Structures are then sized to that volume and to what the subsurface will actually accept, which is a hydrogeological question, not an architectural one.
KIPL designs the plan against the site: recharge shafts, trenches, pits or injection wells selected on the strata and depth to water level, with desilting and filtration arrangements, and with a maintenance regime that keeps them functioning. Two failures recur. The first is a plan sized to satisfy a form rather than to the runoff the site generates. The second is structures built into strata that cannot accept water, which silt up in one or two seasons and then exist only on paper: a position that becomes visible at NOC renewal, when implementation evidence is asked for.

What you get
The deliverables, in hand.
- Authority
- CGWA NOC conditions · State and municipal building regulations
- Typical timeline
- Design in weeks; implementation to suit the construction programme
- Catchment delineation by surface type with runoff coefficients applied
- Harvestable volume computed against local rainfall data
- Recharge structure selection and sizing against subsurface conditions
- Layout drawings with filtration, desilting and conveyance arrangements
- Storage and direct-reuse component where the water can be used rather than recharged
- Maintenance schedule and implementation evidence for the NOC compliance record
Straight answers
Rainwater Harvesting Plan: common questions.
01Why does a groundwater NOC require rainwater harvesting?
Because the CGWA framework treats abstraction as conditional on the user contributing to recharge. The rainwater harvesting and artificial recharge plan is a condition of the NOC, and evidence that it has been implemented and is functioning is expected during the term and at renewal.
02How is the harvesting potential calculated?
By delineating the catchment by surface type (rooftop, paved, unpaved) applying the runoff coefficient appropriate to each, and multiplying by the local rainfall for the period considered. That gives the harvestable volume, which is what the structures are then sized against. A plan not tied to a computed volume is not a design.
03What decides the type of recharge structure?
The subsurface. Depth to water level, the strata encountered and their ability to accept water determine whether recharge shafts, trenches, pits or injection wells are appropriate, and how deep they must go. A structure that suits one geology will silt up or simply not recharge in another, which is why the hydrogeology of the site governs the choice.
04Is this the same as the municipal rainwater harvesting requirement?
They overlap but are separate obligations. Many municipal building bye-laws and State rules require rainwater harvesting on plots above a specified area as a condition of building permission or occupancy. The CGWA condition attaches to the abstraction NOC. A single well-designed system can satisfy both, but the applicable requirements should be checked against each other rather than assumed identical.
05Can harvested rainwater be stored and used instead of recharged?
Yes, and where the water can displace fresh abstraction (for landscaping, flushing, cooling make-up or process use after treatment) direct use is often the better outcome, since it reduces the groundwater demand at source. Many sites do both, storing for immediate use and recharging the surplus.
06What maintenance does a recharge system need?
Desilting chambers cleared before and during the monsoon, filter media inspected and replaced, conveyance channels kept clear, and recharge performance observed against water levels. Without this, structures silt up within a season or two and stop recharging while remaining physically present, which is how systems come to exist on paper only.
07What evidence is expected at NOC renewal?
That the committed structures were actually built to the approved design, and that they are functioning: construction records and photographs, as-built drawings, maintenance logs and water level observation data. A plan with no implementation trail is treated as an unmet condition of the grant.
Within CGWA Groundwater NOC
Part of the whole route, the other components.
Primary sources
Check it at source.
This page describes CGWA NOC conditions · State and municipal building regulations. The regulation and the filing portal are public, these are the official endpoints, not our summary of them.
Relevant proof
Where this stage has already been delivered.

Shapoorji Pallonji · Kanpur & Unnao, Uttar Pradesh
NAMAMI GANGE PROGRAMME
Environmental & Social Impact Assessment and EHS reporting for existing and proposed sewage treatment plants on the Ganga.
Where we do this
CGWA Groundwater NOC on the ground.
The authority, the timeline and the local ground differ by city. These pages set out how cgwa groundwater noc actually runs in each.
Featured projects
Work that carries its own evidence.
Our expertise
One team across the whole environmental brief.
Rainwater Harvesting Plan is one stage of one practice. Most projects need several, and the commitments made at clearance are the ones we build and maintain.
Who we do this for
CGWA Groundwater NOC reads differently by industry.
- 01
Real Estate & ConstructionCore
Borewells for construction water and flushing supply need a CGWA NOC through Bhuneer, and most Mumbai-belt talukas sit in semi-critical or over-exploited blocks.
CGWA Groundwater NOC for Real Estate & Construction - 02
Townships & Area DevelopmentCore
The township water balance has to reconcile municipal supply, groundwater abstraction and reuse before CGWA will issue an NOC on the abstraction component.
CGWA Groundwater NOC for Townships & Area Development - 03
Distilleries & EthanolCore
Fermentation and cooling water demand is high and the sugar belt sits in stressed blocks, so groundwater abstraction is scrutinised at NOC stage.
CGWA Groundwater NOC for Distilleries & Ethanol - 04
Data Centres & IT Parks
Evaporative cooling makes a data centre a serious water consumer, and any groundwater component needs a Bhuneer NOC with a defensible water balance.
CGWA Groundwater NOC for Data Centres & IT Parks - 05
Hospitality, Healthcare & Education
Round-the-clock water demand for laundry, kitchens and cooling usually means a borewell, and therefore a CGWA NOC with a water balance behind it.
CGWA Groundwater NOC for Hospitality, Healthcare & Education - 06
Chemical Industry
Process and cooling water drawn from borewells needs a Bhuneer NOC, and the hydrogeological report must survive the same scrutiny as the EIA.
CGWA Groundwater NOC for Chemical Industry - 07
Sugar Industry
Mills in the Krishna and Godavari belts draw groundwater in blocks already assessed as semi-critical, so the NOC case has to be built carefully.
CGWA Groundwater NOC for Sugar Industry - 08
Industrial & Manufacturing
Units outside MIDC water supply run on borewells, and a Bhuneer NOC with a hydrogeological report is a precondition to consent.
CGWA Groundwater NOC for Industrial & Manufacturing
Trusted by
The organisations this work is done for.















In the press