Risk Assessment Plan: identifying what can go wrong at a coastal site, and how far the consequence reaches.

A risk assessment identifies the hazards a project itself creates, estimates how far their consequences would extend, and sets out the controls and emergency response that bring the residual risk to an acceptable level.

What it is

Risk assessment is the systematic examination of what can fail at a project and what happens if it does: hazard identification across storage, process, handling and transfer; credible failure scenarios; consequence analysis for fire, explosion and toxic release with the distances to specified damage or exposure thresholds; and the resulting risk contours mapped against the layout and the surrounding population. For projects handling hazardous substances above the notified thresholds, this analysis also underpins obligations under the Manufacture, Storage and Import of Hazardous Chemical Rules 1989 and the on-site emergency plan.

KIPL carries the assessment through to design consequence rather than stopping at a scenario list: separation distances that the layout must respect, detection and isolation, containment and bunding, fire water demand and its reliability, and an emergency response plan with defined roles, alarms and escalation. In a coastal setting the assessment also has to be read together with the natural hazard exposure, because storm surge or flooding can defeat containment and cut off access at the moment the response is needed. Assessments that treat the two independently miss the scenarios that matter most on that coast.

Two consultants reviewing an environmental due diligence report and site photographs

What you get

The deliverables, in hand.

Authority
EP Act 1986 · MSIHC Rules 1989 · CRZ Notification 2019 · Factories Act 1948
Typical timeline
Weeks, driven by process and layout information availability
  • Hazard identification across storage, process, handling and transfer operations
  • Credible failure scenarios with consequence analysis and damage distances
  • Risk contours mapped against project layout and surrounding receptors
  • Preventive and mitigative controls with the design implications identified
  • On-site emergency response plan: roles, alarms, escalation, mutual aid
  • Residual risk statement and the monitoring and drill regime that maintains it

Straight answers

Risk Assessment Plan: common questions.

01What does a risk assessment cover?

The hazards the project itself presents (flammable and toxic storage, process conditions, handling and transfer, utilities) and the credible ways they can fail. It estimates the consequence of each failure, expresses it as distances to specified damage or exposure thresholds, and maps that against the layout and the people and assets around it.

02How is it different from a disaster management report?

Risk assessment analyses hazards originating in the project and quantifies their consequence. Disaster management deals with preparedness and response, including for natural hazards originating outside the project such as cyclone and flooding. They meet at the emergency response plan, and a coastal industrial project generally needs both documents.

03When is a quantitative risk assessment required?

Where the nature and quantity of hazardous substances warrant it, particularly where notified thresholds under the hazardous chemical rules are crossed, where an appraisal committee has specified it in the Terms of Reference, or where the project sits close to populated areas. For lower-hazard projects a qualitative hazard identification with consequence screening may be proportionate.

04What does the assessment change about the project?

It should change the design. Separation and layout distances, bunding and containment volumes, detection and isolation arrangements, fire water storage and pump reliability, relief and venting, and the siting of occupied buildings all follow from the consequence distances. An assessment that leaves the design untouched has usually been done too late.

05Why does a coastal setting change the analysis?

Because natural hazard and process hazard interact. Storm surge or flooding can breach bunds, float or displace tanks, disable power and fire water pumping, and cut access for external response, all at the same moment. Scenarios that combine the two are the ones that dominate risk on an exposed coast, and they are missed when the two studies are done in isolation.

06What is an on-site emergency plan?

It is the operational response document that follows from the risk assessment: alarm and communication, incident command roles, muster and evacuation, firefighting and containment actions, medical response, and escalation to external services and mutual aid. For occupiers of major accident hazard installations it is a statutory requirement under the hazardous chemical rules, tested through periodic mock drills.

07Who reviews the risk assessment?

Depending on the project it may be examined by the appraisal committee for Environment Clearance, by the coastal zone management authority for a CRZ project, by the State Pollution Control Board in connection with consent, and by the factory inspectorate under the Factories Act 1948 and the hazardous chemical rules. The same technical basis has to satisfy all of them, which is an argument for doing it once and properly.

Relevant proof

Where this stage has already been delivered.

Ghats along the Ganga, with boats moored at the riverfront

Shapoorji Pallonji · Kanpur & Unnao, Uttar Pradesh

NAMAMI GANGE PROGRAMME

Environmental & Social Impact Assessment and EHS reporting for existing and proposed sewage treatment plants on the Ganga.

130 MLDLargest existing STP
5 plantsAssessed
See the full case →

Our expertise

One team across the whole environmental brief.

Risk Assessment Plan is one stage of one practice. Most projects need several, and the commitments made at clearance are the ones we build and maintain.

All expertise →

Who we do this for

CRZ Clearance reads differently by industry.

Trusted by

The organisations this work is done for.

Panvel Municipal CorporationPyramid InfratechNeelkanth InfratechSatyamJ P InfraPentagon PremisesBhagwati GroupEmperiaDreamTesconPlatinumShree Sai DevelopersVictory RealtorsOlive GroupTricity

Bring us the risk assessment plan, or the whole clearance.