KESARI INFRABUILD PRIVATE LIMITEDEnvironmental Infrastructure Services
CRZ Clearance1:4000

CRZ mapping and demarcation: fixing the zone boundaries across a project site on cadastral scale.

CRZ mapping plots the coastal regulation zone categories and setback lines across a project site on a cadastral-scale base, so that what may be built, and where, is settled on a map rather than argued later.

What it is

The Coastal Regulation Zone Notification 2019 divides the regulated coastal stretch into CRZ-I, comprising ecologically sensitive areas and the intertidal zone, CRZ-II covering developed areas within existing municipal limits, CRZ-III covering relatively undisturbed rural areas with its own No Development Zone widths, and CRZ-IV covering the water area itself. State Coastal Zone Management Plans are prepared at 1:25,000 scale, which is too coarse to resolve a plot boundary, so project-level demarcation is carried out on a cadastral base at 1:4000 scale where individual survey numbers are legible.

KIPL prepares the demarcation map by overlaying the approved Coastal Zone Management Plan, the demarcated High Tide Line and Low Tide Line, the cadastral survey numbers and the project layout onto a single georeferenced base, showing every CRZ category crossing the site, the applicable setbacks and any ecologically sensitive feature. The consequence is immediate and practical: a structure that falls inside a No Development Zone or a CRZ-I patch is not permissible there at any level of justification, and finding that at layout stage is very different from finding it at MCZMA scrutiny.

GIS analyst working on a large screen with a colour land-use and constraints map

What you get

The deliverables, in hand.

Authority
CRZ Notification 2019 · approved Coastal Zone Management Plan · CZMA
Typical timeline
Weeks, depending on survey availability and authorised-agency scheduling
  • Georeferenced base combining CZMP, cadastral survey and project layout
  • CRZ-I to CRZ-IV boundaries plotted across the site with sub-categories
  • No Development Zone and setback lines from HTL marked to scale
  • Ecologically sensitive features identified: mangroves, turtle nesting, dunes and the like
  • Plot-level statement of permissible and non-permissible area by survey number
  • 1:4000 demarcation map suitable for submission with the CRZ application

Straight answers

CRZ Mapping & Demarcation: common questions.

01What are the CRZ categories?

CRZ-I covers ecologically sensitive areas and the area between the Low Tide Line and the High Tide Line; CRZ-II covers developed land areas within existing municipal limits that are substantially built up; CRZ-III covers relatively undisturbed, largely rural areas, sub-divided into IIIA and IIIB with different No Development Zone widths; and CRZ-IV is the water area from the Low Tide Line seaward and in tidal influenced water bodies.

02Why is 1:4000 scale used for demarcation?

Because Coastal Zone Management Plans are prepared at 1:25,000, at which a plot boundary is a fraction of a millimetre and cannot be resolved. Cadastral-scale mapping at 1:4000 shows individual survey numbers against the CRZ lines, which is what a decision on a specific plot requires.

03How far inland does CRZ extend?

On the landward side of the seafront the CRZ extends to 500 metres from the High Tide Line. Along tidal influenced water bodies the CRZ Notification 2019 applies a narrower width, and the No Development Zone within CRZ-III differs between the IIIA and IIIB sub-categories. The applicable widths must be read from the notification against the specific setting.

04Who prepares the Coastal Zone Management Plan?

State and Union Territory Coastal Zone Management Authorities prepare CZMPs, which are approved by the MoEF&CC. They are the reference document for CRZ boundaries in that State, and a project demarcation is prepared against the approved plan in force, not against a superseded or draft version.

05What is the No Development Zone?

It is the belt measured landward from the High Tide Line within which new construction is generally prohibited, subject to the exceptions the notification itself provides. Its width depends on the CRZ category and sub-category and on whether the stretch is densely populated as defined in the notification. A structure proposed within it is not a matter of persuasion; it is not permissible.

06Does CRZ mapping replace an Environment Clearance?

No. CRZ clearance is a separate requirement under the CRZ Notification 2019, and a project may need both CRZ clearance and Environment Clearance under the EIA Notification 2006. Where both apply they are often processed together on Parivesh, but the CRZ demarcation is specific to the coastal regulation and does not substitute for EC documentation.

07When should CRZ mapping be done?

Before the layout is designed. Mapping after a layout is fixed routinely produces structures sitting in No Development Zones or CRZ-I patches, at which point the project is redesigning rather than applying. Where site acquisition is still open, the demarcation is also the honest test of how much of a parcel is actually developable.

Relevant proof

Where this stage has already been delivered.

Ghats along the Ganga, with boats moored at the riverfront

Shapoorji Pallonji · Kanpur & Unnao, Uttar Pradesh

NAMAMI GANGE PROGRAMME

Environmental & Social Impact Assessment and EHS reporting for existing and proposed sewage treatment plants on the Ganga.

130 MLDLargest existing STP
5 plantsAssessed
See the full case →

Our expertise

One team across the whole environmental brief.

CRZ Mapping & Demarcation is one stage of one practice. Most projects need several, and the commitments made at clearance are the ones we build and maintain.

All expertise →

Who we do this for

CRZ Clearance reads differently by industry.

Trusted by

The organisations this work is done for.

Panvel Municipal CorporationPyramid InfratechNeelkanth InfratechSatyamJ P InfraPentagon PremisesBhagwati GroupEmperiaDreamTesconPlatinumShree Sai DevelopersVictory RealtorsOlive GroupTricity

Bring us the crz mapping & demarcation, or the whole clearance.