KESARI INFRABUILD PRIVATE LIMITEDEnvironmental Infrastructure Services

Environment Management & Mitigation Plan in Owe, Kharghar.

Environment Management & Mitigation Plan for Owe: read against this area's own ground, not the city's average.

Why Owe

The ground this work sits on here.

Area
Owe, Kharghar
Practice
Environmental and Advisory Services
Typically for
Any project with EC or consent EMP conditions

At Owe, a construction site sits below the hill and above the village. Runoff from the slope crosses the site, and whatever the site loses (soil, cement slurry, debris) goes downhill into village lanes and streams. The plan here puts drainage first: catch drains above the site, silt traps below it, and no dumping on the slopes. Blasting or rock breaking needs limits agreed with the village in mind, and trucks need a route that avoids its narrow lanes.

Owe is an older village at Kharghar's outer edge, where the node's sectors meet the hills. Its houses and lanes remain, but the fields and open land around it are being taken up by new sectors and residential towers. Above the village, a small dam holds a lake in a fold between the hills, and in the monsoon streams run down past the settlement towards the node. The ground here is steeper and more broken than in central Kharghar. It is still one of the node's quieter corners, but building has been moving steadily towards it.

How it works

Environment Management & Mitigation Plan, from baseline to sign-off.

The full service →
  1. 01/04

    EMP preparation

    The management plan derived from the EIA and the clearance conditions.

  2. 02/04

    Mitigation plan

    Each impact met with a costed, assigned mitigation measure.

  3. 03/04

    Risk management

    Environmental risks identified, ranked and controlled.

  4. 04/04

    EHS reporting

    The reporting that demonstrates the plan is being implemented.

Proof

Comparable work we've delivered.

EHS officer giving a toolbox environmental and safety briefing to a construction

KwaliChem Pvt. Ltd. · TTC Industrial Area, Rabale, Navi Mumbai

EIA for Synthetic Organic Chemical Industry

CTE/CTO application, ToR application, baseline data collection, EIA report and appraisal before the EAC: Category 5(f), the sector KIPL holds Category A accreditation in.

See the full case →

The record

The work, project by project.

Mandate, method and measured outcome, written end to end for every project on this list.

ESDD reports for Panvelkar and Tridhatu Group developments under the last-mile funding window for stalled affordable and mid-income projects.

Read the case study
05 / 08

Straight answers

Environment Management & Mitigation Plan in Owe: common questions.

01The village says our site sends mud into their lane every rain. What should we change?

Find where the site water goes and give it a safe route. Usually that means a drain around the site, a settling pit before the outlet, and covering bare soil before the rains. Clearing the mud already deposited and telling the village what has been done matters too. We survey and set out the fixes.

02How long does environment management & mitigation plan take in Owe?

On timing: prepared at EIA; implemented for project life. A realistic Owe schedule is set once the site and the scope have been read, and the work is carried through to the outcome by the same named people.

Clients & partners

The work is trusted where the stakes are highest.

Two decades of clearances, treatment plants and green infrastructure delivered for India’s builders, industry and public bodies, and the global engineering firms beside them.

Reliance IndustriesPhoenix MarketcityTata Consultancy ServicesAECOMAirTrunkJacobsAuricAGPPyramid InfratechNeelkanth InfratechJ P InfraPentagon PremisesEmperiaDreamTesconPlatinumShree Sai DevelopersVictory RealtorsOlive GroupTricityHaware PropertiesGreenscapeZR2 GroupCH2MShapoorji PallonjiNuclear Power Corporation of IndiaSBI CapsBrihanmumbai Municipal CorporationPanvel Municipal CorporationMaharashtra Jeevan PradhikaranWalchandnagar IndustriesTATA ChemicalsEgisColtAdlabs EntertainmentHindustan Dorr-OliverMacleodsAllcargo LogisticsKalpataruBhagwati GroupAksharParadise GroupSatyamURCCSt RegisJanathaAkzoNobelSheltonKesarChaitanya DevelopersBalajiBhairaav GroupArham DevelopersVishwagreenVarsha GroupPratik GardenMayuresh SquareK Raheja ConstructionsSBI Capital MarketsMaharashtra Jal Jeevan MissionNahar Group

Environment Management & Mitigation Plan in Owe? Start with where the project stands today.

One conversation to read the obligations in front of you and map what it takes to meet them.