KESARI INFRABUILD PRIVATE LIMITEDEnvironmental Infrastructure Services

Environment Management & Mitigation Plan in Kolshet, Thane.

Environment Management & Mitigation Plan for Kolshet: read against this area's own ground, not the city's average.

Why Kolshet

The ground this work sits on here.

Area
Kolshet, Thane
Practice
Environmental and Advisory Services
Typically for
Any project with EC or consent EMP conditions

Building near the Kolshet creek edge raises two site risks the EMP must name. Excavated soil from former industrial land may need testing before it leaves, because contaminated spoil cannot be tipped as ordinary fill. And debris, silt and surplus earth must never reach the mangroves, where dumping is both damaging and an offence. We set up a spoil-testing and tracking routine, silt fences along the creek-facing boundary, and trip records that show where every truck went.

Kolshet lies on Thane's northern edge, where Kolshet Road runs from the Ghodbunder side down towards the creek. Much of the land along it was industrial through the later twentieth century; as those units closed or moved away, their plots were redeveloped as some of the largest residential layouts in the city. The result is a neighbourhood of towers and new internal roads beside an older village and a few surviving industrial compounds. Its creek edge is lined with mangroves, mudflats and tidal channels, with Bhiwandi across the water, and parts of that edge have been opened to the public as waterfront.

How it works

Environment Management & Mitigation Plan, from baseline to sign-off.

The full service →
  1. 01/04

    EMP preparation

    The management plan derived from the EIA and the clearance conditions.

  2. 02/04

    Mitigation plan

    Each impact met with a costed, assigned mitigation measure.

  3. 03/04

    Risk management

    Environmental risks identified, ranked and controlled.

  4. 04/04

    EHS reporting

    The reporting that demonstrates the plan is being implemented.

Proof

Comparable work we've delivered.

EHS officer giving a toolbox environmental and safety briefing to a construction

KwaliChem Pvt. Ltd. · TTC Industrial Area, Rabale, Navi Mumbai

EIA for Synthetic Organic Chemical Industry

CTE/CTO application, ToR application, baseline data collection, EIA report and appraisal before the EAC: Category 5(f), the sector KIPL holds Category A accreditation in.

See the full case →

The record

The work, project by project.

Mandate, method and measured outcome, written end to end for every project on this list.

The Mayor's residence for the Panvel Municipal Corporation, built from concept to completion: columned elevations, terraces, landscape, external works and architectural lighting.

Read the case study
05 / 08

Straight answers

Environment Management & Mitigation Plan in Kolshet: common questions.

01A contractor has offered to take our excavated earth away for free. Is that a problem?

It can be. If the earth ends up as fill on creek-side land or over mangroves, the project that produced it can be drawn into the case. Ask where it is going, get the destination in writing, and keep trip records to an approved site. We build that tracking into the EMP so the site can always show where its spoil went.

02How long does environment management & mitigation plan take in Kolshet?

On timing: prepared at EIA; implemented for project life. A realistic Kolshet schedule is set once the site and the scope have been read, and the work is carried through to the outcome by the same named people.

Clients & partners

The work is trusted where the stakes are highest.

Two decades of clearances, treatment plants and green infrastructure delivered for India’s builders, industry and public bodies, and the global engineering firms beside them.

Reliance IndustriesPhoenix MarketcityTata Consultancy ServicesAECOMAirTrunkJacobsAuricAGPPyramid InfratechNeelkanth InfratechJ P InfraPentagon PremisesEmperiaDreamTesconPlatinumShree Sai DevelopersVictory RealtorsOlive GroupTricityHaware PropertiesGreenscapeZR2 GroupCH2MShapoorji PallonjiNuclear Power Corporation of IndiaSBI CapsBrihanmumbai Municipal CorporationPanvel Municipal CorporationMaharashtra Jeevan PradhikaranWalchandnagar IndustriesTATA ChemicalsEgisColtAdlabs EntertainmentHindustan Dorr-OliverMacleodsAllcargo LogisticsKalpataruBhagwati GroupAksharParadise GroupSatyamURCCSt RegisJanathaAkzoNobelSheltonKesarChaitanya DevelopersBalajiBhairaav GroupArham DevelopersVishwagreenVarsha GroupPratik GardenMayuresh SquareK Raheja ConstructionsSBI Capital MarketsMaharashtra Jal Jeevan MissionNahar Group

Environment Management & Mitigation Plan in Kolshet? Start with where the project stands today.

One conversation to read the obligations in front of you and map what it takes to meet them.