KESARI INFRABUILD PRIVATE LIMITEDEnvironmental Infrastructure Services

Miyawaki Urban Dense Forestation in Ghodbunder Road, Thane.

Miyawaki Urban Dense Forestation for Ghodbunder Road: read against this area's own ground, not the city's average.

Why Ghodbunder Road

The ground this work sits on here.

Area
Ghodbunder Road, Thane
Practice
Urban Ecology and Green Infrastructure Services
Typically for
Municipal corporations, developers, industry, CER/CSR programmes

Every large Ghodbunder Road layout sets aside recreational open space, and most of it ends up as lawn and paving. A dense native block of a few hundred square metres in one corner changes what that space offers: shade, birds, a cooler edge towards the road. The species palette can be drawn from the national park's forest a short distance away rather than a nursery catalogue. We prepare the soil, plant densely in the first monsoon and look after the block until it can look after itself.

Ghodbunder Road runs north-west from Majiwada to Gaimukh, where it climbs through the ghat towards Mira-Bhayandar and the Western Express Highway. For much of its length the hills of Sanjay Gandhi National Park rise on one side, and the land falls away on the other towards the creek and its mangroves. Between the two, farmland and village land have become towers and gated townships, Manpada, Waghbil and Owale are now names of residential neighbourhoods as much as villages. The Metro Line 4 viaduct runs along the road, and service roads, flyovers and widening have followed it. The corridor is still filling in.

How it works

Miyawaki Urban Dense Forestation, from survey to survival.

The full service →
  1. 01/05

    Native species selection

    A multi-layer palette of native species chosen to the soil, climate and the forest's intended structure.

  2. 02/05

    Soil analysis & enhancement

    Soil tested and amended with the biomass and nutrients dense planting needs to establish fast.

  3. 03/05

    Dense plantation

    Close, multi-layer planting on a marked grid, the density that makes a Miyawaki forest grow upward.

  4. 04/05

    Maintenance & survival monitoring

    Two to three years of watering, weeding and, crucially, measured survival, the number the whole method is judged on.

  5. 05/05

    Carbon estimation

    Where required, an estimate of the carbon sequestered, so the outcome is a figure, not a claim.

Local proof

Comparable work in Thane.

large mature tree being transplanted with a hydraulic crane

URCC · Thane, Maharashtra

GREEN ZONE & TREE MANAGEMENT, THANE

Green-zone and tree management for the Amazon – Devi Constructions project at Thane: Miyawaki plantation and maintenance of approximately 3,000 plants, transplantation and maintenance of 72 trees, and tree cutting of 240 trees.

See the full case →

The record

The work, project by project.

Mandate, method and measured outcome, written end to end for every project on this list.

ESDD reports for Panvelkar and Tridhatu Group developments under the last-mile funding window for stalled affordable and mid-income projects.

Read the case study
05 / 08

Straight answers

Miyawaki Urban Dense Forestation in Ghodbunder Road: common questions.

01Can a Miyawaki forest go in our layout's recreation ground, or does that break the rules?

Planting generally fits the purpose of recreational open space, but a dense forest residents cannot enter may not, if it takes the whole space. The usual approach is a block along one edge, with paths and open lawn kept in the rest. We check the sanctioned layout and any conditions on the space, and agree the plan with the society before planting.

02How long does miyawaki urban dense forestation take in Ghodbunder Road?

On timing: plantation seasonal; monitoring 2–3 years. A realistic Ghodbunder Road schedule is set once the site and the scope have been read, and the work is carried through to the outcome by the same named people.

Clients & partners

The work is trusted where the stakes are highest.

Two decades of clearances, treatment plants and green infrastructure delivered for India’s builders, industry and public bodies, and the global engineering firms beside them.

Reliance IndustriesPhoenix MarketcityTata Consultancy ServicesAECOMAirTrunkJacobsAuricAGPPyramid InfratechNeelkanth InfratechJ P InfraPentagon PremisesEmperiaDreamTesconPlatinumShree Sai DevelopersVictory RealtorsOlive GroupTricityHaware PropertiesGreenscapeZR2 GroupCH2MShapoorji PallonjiNuclear Power Corporation of IndiaSBI CapsBrihanmumbai Municipal CorporationPanvel Municipal CorporationMaharashtra Jeevan PradhikaranWalchandnagar IndustriesTATA ChemicalsEgisColtAdlabs EntertainmentHindustan Dorr-OliverMacleodsAllcargo LogisticsKalpataruBhagwati GroupAksharParadise GroupSatyamURCCSt RegisJanathaAkzoNobelSheltonKesarChaitanya DevelopersBalajiBhairaav GroupArham DevelopersVishwagreenVarsha GroupPratik GardenMayuresh SquareK Raheja ConstructionsSBI Capital MarketsMaharashtra Jal Jeevan MissionNahar Group

Miyawaki Urban Dense Forestation in Ghodbunder Road? Start with the ground you have.

One conversation to walk the site and plan for what survives: not just what gets planted.