CGWA Groundwater NOC in Ghodbunder Road, Thane.

CGWA Groundwater NOC for Ghodbunder Road: read against this area's own ground, not the city's average.

Why Ghodbunder Road

The ground this work sits on here.

Area
Ghodbunder Road, Thane
Practice
Environment Approvals
Typically for
Projects abstracting groundwater for construction or operation

Where a Ghodbunder Road tower goes down into basements rather than up into a podium, excavation meets water that the hill-side ground holds through and after the monsoon. Pumping it out is dewatering, and under the CGWA's guidelines that needs a groundwater NOC, applied for on the Bhuneer portal. So does a borewell the finished layout draws on to top up municipal and tanker supply. We prepare the hydrogeological report, estimate the volume honestly, and set up the metering and recharge the NOC will ask for.

Ghodbunder Road runs north-west from Majiwada to Gaimukh, where it climbs through the ghat towards Mira-Bhayandar and the Western Express Highway. For much of its length the hills of Sanjay Gandhi National Park rise on one side, and the land falls away on the other towards the creek and its mangroves. Between the two, farmland and village land have become towers and gated townships, Manpada, Waghbil and Owale are now names of residential neighbourhoods as much as villages. The Metro Line 4 viaduct runs along the road, and service roads, flyovers and widening have followed it. The corridor is still filling in.

How it works

CGWA Groundwater NOC, the route to grant.

The full service →
  1. 01/04

    Hydrogeological report

    The aquifer assessment that underpins any abstraction case.

  2. 02/04

    Water-balance study

    Demand against availability: what the project needs versus what the block can sustain.

  3. 03/04

    Block assessment

    Whether the location sits in a notified or over-exploited block, which decides permissibility.

  4. 04/04

    Bhuneer filing & RWH

    The portal application and the rainwater-harvesting plan that conditions the NOC.

Local proof

Comparable work in Thane.

large residential construction site in an Indian city with towers rising and gre

Haware Properties LLP · Shil Phata, Thane

Environment Clearance for a residential and commercial development

Haware My First Home, Shil Phata Phase 1: a greenfield residential and commercial project in a residential-plus-commercial zone under Thane Municipal Corporation, taken through Environment Clearance on a 16,280 sq m plot with 98,746.54 sq m of construction.

See the full case →

The record

The work, project by project.

Mandate, method and measured outcome, written end to end for every project on this list.

CTE/CTO application, ToR application, baseline data collection, EIA report and appraisal before the EAC: Category 5(f), the sector KIPL holds Category A accreditation in.

Read the case study
05 / 08

Straight answers

CGWA Groundwater NOC in Ghodbunder Road: common questions.

01We only pump out water while digging the basement. Do we still need a NOC?

Generally yes. Construction dewatering is treated as abstraction under the guidelines even when it is temporary, and the NOC sets conditions on how the water is used or discharged. Much of what is pumped out can go to curing, dust suppression and wheel washing rather than straight to the drain. We prepare the application and a plan for where the water goes.

02How long does cgwa groundwater noc take in Ghodbunder Road?

On timing: weeks to a few months, block-status dependent. A realistic Ghodbunder Road schedule is set once the site and the scope have been read, and the work is carried through to the outcome by the same named people.

Clients & partners

The work is trusted where the stakes are highest.

Two decades of clearances, treatment plants and green infrastructure delivered for India’s builders, industry and public bodies, and the global engineering firms beside them.

Reliance IndustriesPhoenix MarketcityTata Consultancy ServicesAECOMAirTrunkJacobsAuricAGPPyramid InfratechNeelkanth InfratechJ P InfraPentagon PremisesEmperiaDreamTesconPlatinumShree Sai DevelopersVictory RealtorsOlive GroupTricityHaware PropertiesGreenscapeZR2 GroupCH2MShapoorji PallonjiNuclear Power Corporation of IndiaSBI CapsBrihanmumbai Municipal CorporationPanvel Municipal CorporationMaharashtra Jeevan PradhikaranWalchandnagar IndustriesTATA ChemicalsEgisColtAdlabs EntertainmentHindustan Dorr-OliverMacleodsAllcargo LogisticsKalpataruBhagwati GroupAksharParadise GroupSatyamURCCSt RegisJanathaAkzoNobelSheltonKesarChaitanya DevelopersBalajiBhairaav GroupArham DevelopersVishwagreenVarsha GroupPratik GardenMayuresh SquareK Raheja ConstructionsSBI Capital MarketsMaharashtra Jal Jeevan MissionNahar Group

CGWA Groundwater NOC in Ghodbunder Road? Start with the file in front of you.

One conversation to screen your project and map the route to grant.