KESARI INFRABUILD PRIVATE LIMITEDEnvironmental Infrastructure Services

Integrated Solid Waste Management in Vasai MIDC, Vasai-Virar.

Integrated Solid Waste Management for Vasai MIDC: read against this area's own ground, not the city's average.

Why Vasai MIDC

The ground this work sits on here.

Area
Vasai MIDC, Vasai-Virar
Practice
Sustainable Infrastructure Services
Typically for
Housing societies, campuses, hotels, markets, institutions (bulk generators)

Waste in a Vasai MIDC unit is mostly a sorting problem. Metal swarf, off-cut plastic and cartons have a buyer; spent oil, contaminated cloth, chemical residue and ETP sludge are hazardous and belong only at an authorised facility. When the two are kept together, the saleable waste is lost and the hazardous waste goes somewhere it should not. We mark out a separate, labelled bay for every stream and tie each one to a buyer or a disposal route with records to show for it.

Vasai MIDC is the town's planned industrial area, laid out east of the railway on the road inland from Vasai Road station. It is a working estate of modest plots rather than large campuses: engineering and fabrication shops, plastic moulders, packaging and printing units, and a number of small chemical and pharmaceutical formulators. Many units began as family businesses and are still run by the people who founded them or their children. Around the estate the land has filled with housing, shops and transport yards, so the boundary between industrial plot and neighbourhood is now mostly a compound wall. Some older plots have been sold, split or put to new uses.

How it works

Integrated Solid Waste Management, the route to grant.

The full service →
  1. 01/05

    Waste assessment

    Quantities and composition measured across the wet, dry and domestic-hazardous streams, the basis for right-sizing everything.

  2. 02/05

    Segregation & collection design

    Colour-coded, source-level segregation and a collection flow the residents or staff will actually follow.

  3. 03/05

    Material recovery

    A recovery step for dry recyclables, cutting what goes to landfill and turning waste into value.

  4. 04/05

    Decentralised processing

    On-site composting or biomethanation for the wet fraction, sized to the load, with a plan for the finished compost or gas.

  5. 05/05

    DPR & compliance

    A detailed project report where needed and the records that satisfy the urban local body and the bulk-generator rules.

Proof

Comparable work we've delivered.

decentralised waste-processing yard at a township with colour-coded bins and a c

MIDC / AURIC · Shendra & Bidkin, Chhatrapati Sambhajinagar

SHENDRA AND BIDKIN INDUSTRIAL AREA, AURANGABAD

Environmental compliance audits, Consent to Establish and green certification support across two industrial nodes of the Delhi-Mumbai Industrial Corridor.

See the full case →

The record

The work, project by project.

Mandate, method and measured outcome, written end to end for every project on this list.

CTE/CTO application, ToR application, baseline data collection, EIA report and appraisal before the EAC: Category 5(f), the sector KIPL holds Category A accreditation in.

Read the case study
05 / 08

Straight answers

Integrated Solid Waste Management in Vasai MIDC: common questions.

01Where should a small unit send its hazardous waste?

To a facility authorised to receive it, which for most categories in this region means the common treatment and disposal facilities or an authorised recycler for items like used oil. The route must match what your authorisation lists. We confirm the categories, arrange the route, and keep the manifests that show each consignment reached its destination.

02How long does integrated solid waste management take in Vasai MIDC?

On timing: assessment in weeks; system by site scale. A realistic Vasai MIDC schedule is set once the site and the scope have been read, and the work is carried through to the outcome by the same named people.

Clients & partners

The work is trusted where the stakes are highest.

Two decades of clearances, treatment plants and green infrastructure delivered for India’s builders, industry and public bodies, and the global engineering firms beside them.

Reliance IndustriesPhoenix MarketcityTata Consultancy ServicesAECOMAirTrunkJacobsAuricAGPPyramid InfratechNeelkanth InfratechJ P InfraPentagon PremisesEmperiaDreamTesconPlatinumShree Sai DevelopersVictory RealtorsOlive GroupTricityHaware PropertiesGreenscapeZR2 GroupCH2MShapoorji PallonjiNuclear Power Corporation of IndiaSBI CapsBrihanmumbai Municipal CorporationPanvel Municipal CorporationMaharashtra Jeevan PradhikaranWalchandnagar IndustriesTATA ChemicalsEgisColtAdlabs EntertainmentHindustan Dorr-OliverMacleodsAllcargo LogisticsKalpataruBhagwati GroupAksharParadise GroupSatyamURCCSt RegisJanathaAkzoNobelSheltonKesarChaitanya DevelopersBalajiBhairaav GroupArham DevelopersVishwagreenVarsha GroupPratik GardenMayuresh SquareK Raheja ConstructionsSBI Capital MarketsMaharashtra Jal Jeevan MissionNahar Group

Integrated Solid Waste Management in Vasai MIDC? Start with the file in front of you.

One conversation to screen your project and map the route to grant.