KESARI INFRABUILD PRIVATE LIMITEDEnvironmental Infrastructure Services

Integrated Solid Waste Management in Uttan, Mira-Bhayandar.

Integrated Solid Waste Management for Uttan: read against this area's own ground, not the city's average.

Why Uttan

The ground this work sits on here.

Area
Uttan, Mira-Bhayandar
Practice
Sustainable Infrastructure Services
Typically for
Housing societies, campuses, hotels, markets, institutions (bulk generators)

The refuse dumped near Uttan shows what happens when a city's waste is not separated and processed where it is made. For resorts, institutions and villages here, we set up segregation, on-site composting of wet waste where space allows, and collection of dry waste for recycling, so that less goes to the dump. For the corporation, we can assess the dumping ground itself and set out options for processing fresh waste and treating the old.

Uttan lies at the western end of the city, a coastal area of fishing villages, low hills and beaches facing the Arabian Sea, reached by the road out of Bhayandar. Its Koli and East Indian communities have lived here for generations by fishing and farming, and the villages keep their churches, wadis and small landing points for boats. There are resorts, retreat centres and weekend homes, and to the south the area runs on towards Gorai. It is also where the corporation's refuse has long been dumped, a use that has drawn repeated protest from the villages nearby.

How it works

Integrated Solid Waste Management, the route to grant.

The full service →
  1. 01/05

    Waste assessment

    Quantities and composition measured across the wet, dry and domestic-hazardous streams, the basis for right-sizing everything.

  2. 02/05

    Segregation & collection design

    Colour-coded, source-level segregation and a collection flow the residents or staff will actually follow.

  3. 03/05

    Material recovery

    A recovery step for dry recyclables, cutting what goes to landfill and turning waste into value.

  4. 04/05

    Decentralised processing

    On-site composting or biomethanation for the wet fraction, sized to the load, with a plan for the finished compost or gas.

  5. 05/05

    DPR & compliance

    A detailed project report where needed and the records that satisfy the urban local body and the bulk-generator rules.

Proof

Comparable work we've delivered.

decentralised waste-processing yard at a township with colour-coded bins and a c

MIDC / AURIC · Shendra & Bidkin, Chhatrapati Sambhajinagar

SHENDRA AND BIDKIN INDUSTRIAL AREA, AURANGABAD

Environmental compliance audits, Consent to Establish and green certification support across two industrial nodes of the Delhi-Mumbai Industrial Corridor.

See the full case →

The record

The work, project by project.

Mandate, method and measured outcome, written end to end for every project on this list.

CTE/CTO application, ToR application, baseline data collection, EIA report and appraisal before the EAC: Category 5(f), the sector KIPL holds Category A accreditation in.

Read the case study
05 / 08

Straight answers

Integrated Solid Waste Management in Uttan: common questions.

01What can be done about an old dumping ground?

Options include biomining to recover recyclable material and cut the volume, capping to stop rain soaking through, collecting and treating leachate, and managing landfill gas. Which combination suits depends on how old and large the heap is and what it holds. We study the heap and lay out each option with its cost and timescale.

02How long does integrated solid waste management take in Uttan?

On timing: assessment in weeks; system by site scale. A realistic Uttan schedule is set once the site and the scope have been read, and the work is carried through to the outcome by the same named people.

Keep exploring

Where this connects.

Clients & partners

The work is trusted where the stakes are highest.

Two decades of clearances, treatment plants and green infrastructure delivered for India’s builders, industry and public bodies, and the global engineering firms beside them.

Reliance IndustriesPhoenix MarketcityTata Consultancy ServicesAECOMAirTrunkJacobsAuricAGPPyramid InfratechNeelkanth InfratechJ P InfraPentagon PremisesEmperiaDreamTesconPlatinumShree Sai DevelopersVictory RealtorsOlive GroupTricityHaware PropertiesGreenscapeZR2 GroupCH2MShapoorji PallonjiNuclear Power Corporation of IndiaSBI CapsBrihanmumbai Municipal CorporationPanvel Municipal CorporationMaharashtra Jeevan PradhikaranWalchandnagar IndustriesTATA ChemicalsEgisColtAdlabs EntertainmentHindustan Dorr-OliverMacleodsAllcargo LogisticsKalpataruBhagwati GroupAksharParadise GroupSatyamURCCSt RegisJanathaAkzoNobelSheltonKesarChaitanya DevelopersBalajiBhairaav GroupArham DevelopersVishwagreenVarsha GroupPratik GardenMayuresh SquareK Raheja ConstructionsSBI Capital MarketsMaharashtra Jal Jeevan MissionNahar Group

Integrated Solid Waste Management in Uttan? Start with the file in front of you.

One conversation to screen your project and map the route to grant.