KESARI INFRABUILD PRIVATE LIMITEDEnvironmental Infrastructure Services

Sewage Treatment Plants in Navade, Taloja.

Sewage Treatment Plants for Navade: read against this area's own ground, not the city's average.

Why Navade

The ground this work sits on here.

Area
Navade, Taloja
Practice
Sustainable Infrastructure Services
Typically for
Townships, high-rises, campuses, hotels, hospitals, industrial colonies

Newer residential buildings around Navade, and the larger ones going up in the node, must clean their own wastewater under their approvals. Where the municipal network is still catching up, the plant's output has to go somewhere sensible, and that often means reusing much of it on site. We size the plant for real occupancy, design dual plumbing so flushing uses treated water, and arrange regular testing, letting the committee know what quality leaves the building.

Navade lies on the western side of the Taloja estate, between Kalamboli and Kharghar, around the village of the same name and the Navade Road station on the rail line from Panvel towards Diva. CIDCO developed a small node here of plots and residential buildings, and the estate's industrial plots meet it along its eastern edge. Warehouses, small workshops and service units fill the ground in between. It is a place where families live, and where the estate's trucks and smells are close by. Many of its residents work in the estate, in Kalamboli's yards or further along the rail line.

How it works

Sewage Treatment Plants, the route to grant.

The full service →
  1. 01/05

    Load & technology selection

    Design flow and organic load worked out from occupancy, then the SBR / MBBR / MBR / FAB choice that fits the land, power and reuse target.

  2. 02/05

    Design & DPR

    Process design, hydraulics, civil and MEP, and a detailed project report with a defensible cost per KLD.

  3. 03/05

    Build & install (EPC)

    Turnkey construction, equipment supply and installation, integrated with the building's plumbing and reuse network.

  4. 04/05

    Commissioning & testing

    Seeding, stabilisation and performance testing against the design outlet quality before handover.

  5. 05/05

    Operations & monitoring

    O&M with routine sampling and the effluent records that keep the consent and EC compliance defensible.

Proof

Comparable work we've delivered.

operator on the walkway of a sequencing-batch-reactor STP checking an aeration t

Shapoorji Pallonji · Kanpur & Unnao, Uttar Pradesh

NAMAMI GANGE PROGRAMME

Environmental & Social Impact Assessment and EHS reporting for existing and proposed sewage treatment plants on the Ganga.

See the full case →

The record

The work, project by project.

Mandate, method and measured outcome, written end to end for every project on this list.

Category B1 under Schedule 8(b): EIA and EMP prepared and carried through SEIAA appraisal for the expansion at Nerul.

Read the case study
05 / 08

Straight answers

Sewage Treatment Plants in Navade: common questions.

01Our Navade building's STP water looks clear but smells. Is it safe to reuse for flushing?

Clear but smelly water usually means disinfection or aeration is not working well. It should be tested before reuse. Most often the fix is adjusting aeration, clearing the filters or restoring chlorination. We sample it and adjust the plant so it is fit for flushing.

02How long does sewage treatment plants take in Navade?

On timing: dPR in weeks; build & commissioning by project schedule. A realistic Navade schedule is set once the site and the scope have been read, and the work is carried through to the outcome by the same named people.

Keep exploring

Where this connects.

Clients & partners

The work is trusted where the stakes are highest.

Two decades of clearances, treatment plants and green infrastructure delivered for India’s builders, industry and public bodies, and the global engineering firms beside them.

Reliance IndustriesPhoenix MarketcityTata Consultancy ServicesAECOMAirTrunkJacobsAuricAGPPyramid InfratechNeelkanth InfratechJ P InfraPentagon PremisesEmperiaDreamTesconPlatinumShree Sai DevelopersVictory RealtorsOlive GroupTricityHaware PropertiesGreenscapeZR2 GroupCH2MShapoorji PallonjiNuclear Power Corporation of IndiaSBI CapsBrihanmumbai Municipal CorporationPanvel Municipal CorporationMaharashtra Jeevan PradhikaranWalchandnagar IndustriesTATA ChemicalsEgisColtAdlabs EntertainmentHindustan Dorr-OliverMacleodsAllcargo LogisticsKalpataruBhagwati GroupAksharParadise GroupSatyamURCCSt RegisJanathaAkzoNobelSheltonKesarChaitanya DevelopersBalajiBhairaav GroupArham DevelopersVishwagreenVarsha GroupPratik GardenMayuresh SquareK Raheja ConstructionsSBI Capital MarketsMaharashtra Jal Jeevan MissionNahar Group

Sewage Treatment Plants in Navade? Start with the file in front of you.

One conversation to screen your project and map the route to grant.