KESARI INFRABUILD PRIVATE LIMITEDEnvironmental Infrastructure Services

Effluent Treatment Plants in Andheri (E) MIDC, Mumbai.

Effluent Treatment Plants for Andheri (E) MIDC: read against this area's own ground, not the city's average.

Why Andheri (E) MIDC

The ground this work sits on here.

Area
Andheri (E) MIDC, Mumbai
Practice
Sustainable Infrastructure Services
Typically for
Chemical, pharma, textile, food, distillery and engineering units

Effluent in Andheri MIDC is small in volume and varied in content: rinse water from plating or cosmetics mixing, washings from pharmaceutical formulation, cleaning water from food processing. Most units have little space and discharge into shared sewers. Treatment is therefore compact and specific to the process (neutralisation, oil separation, settling or filtration), rather than a full plant. We characterise the water first, then design the smallest system that meets the limits the consent sets.

The MIDC industrial area at Marol in Andheri East was set up for small and medium industry close to the airport, and it still holds that mix: engineering shops, pharmaceutical and cosmetic units, printers, food processors and electronics workshops, many in shared industrial buildings. The SEEPZ export zone lies beside it. Over time many plots have become offices, IT buildings and hotels, and the metro now runs through the area. Housing and settlements surround the estate on every side. It is a working industrial area that is gradually turning into an office district.

How it works

Effluent Treatment Plants, the route to grant.

The full service →
  1. 01/05

    Effluent characterisation

    The real waste stream sampled and analysed (flow, pH, COD / BOD, TDS, colour and specific contaminants) before a single unit is sized.

  2. 02/05

    Process design

    Primary (equalisation, neutralisation), secondary (biological) and tertiary (filtration, RO) stages engineered to the consent outlet quality.

  3. 03/05

    ZLD engineering (where required)

    RO and multiple-effect evaporator / ATFD trains to recover water and reach zero discharge for the specified categories.

  4. 04/05

    Build & commissioning (EPC)

    Turnkey construction, dosing and control systems, then stabilisation and performance testing.

  5. 05/05

    Monitoring & compliance

    Effluent-quality monitoring and the records that keep the CTO and any online-monitoring obligation in good standing.

Local proof

Comparable work in Mumbai.

The finished landscaped recreational space at Kalamboli Sector 2: play equipment, walkways and planting

CIDCO · Kalamboli, Navi Mumbai

RECREATIONAL SPACE DEVELOPMENT, KALAMBOLI SECTOR 2

A landscaped recreational space with play area, walkways, gazebo and utility spaces, completed with horticulture, flowerbeds and landscape lighting.

See the full case →

The record

The work, project by project.

Mandate, method and measured outcome, written end to end for every project on this list.

A 120 KLD effluent treatment plant on a conventional treatment process.

Read the case study
05 / 08

Straight answers

Effluent Treatment Plants in Andheri (E) MIDC: common questions.

01Our effluent is mostly floor washing. Does it need treatment?

Often it does. Floor washings in a production area carry product residue, oils and cleaning chemicals. Whether treatment is required, and how much, depends on what the tests show and what the consent sets. We sample the water under normal working conditions and recommend treatment matched to what is actually present.

02How long does effluent treatment plants take in Andheri (E) MIDC?

On timing: design to commissioning by project schedule. A realistic Andheri (E) MIDC schedule is set once the site and the scope have been read, and the work is carried through to the outcome by the same named people.

Clients & partners

The work is trusted where the stakes are highest.

Two decades of clearances, treatment plants and green infrastructure delivered for India’s builders, industry and public bodies, and the global engineering firms beside them.

Reliance IndustriesPhoenix MarketcityTata Consultancy ServicesAECOMAirTrunkJacobsAuricAGPPyramid InfratechNeelkanth InfratechJ P InfraPentagon PremisesEmperiaDreamTesconPlatinumShree Sai DevelopersVictory RealtorsOlive GroupTricityHaware PropertiesGreenscapeZR2 GroupCH2MShapoorji PallonjiNuclear Power Corporation of IndiaSBI CapsBrihanmumbai Municipal CorporationPanvel Municipal CorporationMaharashtra Jeevan PradhikaranWalchandnagar IndustriesTATA ChemicalsEgisColtAdlabs EntertainmentHindustan Dorr-OliverMacleodsAllcargo LogisticsKalpataruBhagwati GroupAksharParadise GroupSatyamURCCSt RegisJanathaAkzoNobelSheltonKesarChaitanya DevelopersBalajiBhairaav GroupArham DevelopersVishwagreenVarsha GroupPratik GardenMayuresh SquareK Raheja ConstructionsSBI Capital MarketsMaharashtra Jal Jeevan MissionNahar Group

Effluent Treatment Plants in Andheri (E) MIDC? Start with the file in front of you.

One conversation to screen your project and map the route to grant.