KESARI INFRABUILD PRIVATE LIMITEDEnvironmental Infrastructure Services

Integrated Solid Waste Management in Wagle Estate MIDC, Thane.

Integrated Solid Waste Management for Wagle Estate MIDC: read against this area's own ground, not the city's average.

Why Wagle Estate MIDC

The ground this work sits on here.

Area
Wagle Estate MIDC, Thane
Practice
Sustainable Infrastructure Services
Typically for
Housing societies, campuses, hotels, markets, institutions (bulk generators)

Waste from a Wagle Estate unit comes in three streams that often end up mixed on the same shop floor: hazardous waste under the unit's authorisation: spent solvent, oily rags, ETP sludge; recyclable scrap such as metal turnings, cartons and film; and ordinary waste from the canteen and office. Mixing them is how a skip of saleable scrap becomes a hazardous-waste problem. We set up segregation where waste is generated, labelled storage, and records tying each stream to an authorised recycler or disposal route.

Wagle Estate is a grid of numbered roads in Thane West, lined with sheds, galas and multi-storey industrial buildings, with the Yeoor hills rising behind. Its units are mostly small and medium (engineering shops, packaging converters, pharmaceutical and chemical formulators) and many share one building, one yard and one drain. Over the years some plots have been rebuilt as IT parks and office blocks, so a machine shop may now stand beside a floor of desks. Dense housing and settlements have grown up along its edges and up the lower slopes, and people now live within a wall's width of working units. The estate is changing tenant by tenant rather than all at once.

How it works

Integrated Solid Waste Management, the route to grant.

The full service →
  1. 01/05

    Waste assessment

    Quantities and composition measured across the wet, dry and domestic-hazardous streams, the basis for right-sizing everything.

  2. 02/05

    Segregation & collection design

    Colour-coded, source-level segregation and a collection flow the residents or staff will actually follow.

  3. 03/05

    Material recovery

    A recovery step for dry recyclables, cutting what goes to landfill and turning waste into value.

  4. 04/05

    Decentralised processing

    On-site composting or biomethanation for the wet fraction, sized to the load, with a plan for the finished compost or gas.

  5. 05/05

    DPR & compliance

    A detailed project report where needed and the records that satisfy the urban local body and the bulk-generator rules.

Proof

Comparable work we've delivered.

decentralised waste-processing yard at a township with colour-coded bins and a c

MIDC / AURIC · Shendra & Bidkin, Chhatrapati Sambhajinagar

SHENDRA AND BIDKIN INDUSTRIAL AREA, AURANGABAD

Environmental compliance audits, Consent to Establish and green certification support across two industrial nodes of the Delhi-Mumbai Industrial Corridor.

See the full case →

The record

The work, project by project.

Mandate, method and measured outcome, written end to end for every project on this list.

Category B1 under Schedule 8(b): EIA and EMP prepared and carried through SEIAA appraisal for the expansion at Nerul.

Read the case study
05 / 08

Straight answers

Integrated Solid Waste Management in Wagle Estate MIDC: common questions.

01Can we sell our empty chemical drums to the scrap dealer?

Not as ordinary scrap. Containers that held hazardous chemicals are themselves hazardous waste under the 2016 rules until they are decontaminated, so they should go to an authorised recycler or be cleaned under your authorisation before sale. We check what your authorisation allows, set up the route and the paperwork, and make sure every drum leaves the gate with a record.

02How long does integrated solid waste management take in Wagle Estate MIDC?

On timing: assessment in weeks; system by site scale. A realistic Wagle Estate MIDC schedule is set once the site and the scope have been read, and the work is carried through to the outcome by the same named people.

Clients & partners

The work is trusted where the stakes are highest.

Two decades of clearances, treatment plants and green infrastructure delivered for India’s builders, industry and public bodies, and the global engineering firms beside them.

Reliance IndustriesPhoenix MarketcityTata Consultancy ServicesAECOMAirTrunkJacobsAuricAGPPyramid InfratechNeelkanth InfratechJ P InfraPentagon PremisesEmperiaDreamTesconPlatinumShree Sai DevelopersVictory RealtorsOlive GroupTricityHaware PropertiesGreenscapeZR2 GroupCH2MShapoorji PallonjiNuclear Power Corporation of IndiaSBI CapsBrihanmumbai Municipal CorporationPanvel Municipal CorporationMaharashtra Jeevan PradhikaranWalchandnagar IndustriesTATA ChemicalsEgisColtAdlabs EntertainmentHindustan Dorr-OliverMacleodsAllcargo LogisticsKalpataruBhagwati GroupAksharParadise GroupSatyamURCCSt RegisJanathaAkzoNobelSheltonKesarChaitanya DevelopersBalajiBhairaav GroupArham DevelopersVishwagreenVarsha GroupPratik GardenMayuresh SquareK Raheja ConstructionsSBI Capital MarketsMaharashtra Jal Jeevan MissionNahar Group

Integrated Solid Waste Management in Wagle Estate MIDC? Start with the file in front of you.

One conversation to screen your project and map the route to grant.