KESARI INFRABUILD PRIVATE LIMITEDEnvironmental Infrastructure Services
Back to projects

Water supply · infrastructure delivery

Walchandnagar Industries, Andhra Pradesh: 8 km of water supply infrastructure

A concrete intake structure on a canal with valve gear above it, a pipeline running away toward an industrial works in the distance

01 02

Location
Andhra Pradesh
Market
Industrial & Manufacturing
Client
Walchandnagar Industries
Practice
Sustainable Infrastructure & Project Delivery

Eight kilometres of water supply infrastructure for Walchandnagar Industries in Andhra Pradesh: intake well, pipeline and pumping works sized to the project's own distribution requirement.

The brief

Water supply is a chain, and it is only as good as its weakest link: an intake that silts, a main that leaks, or a pump sized for a head it does not actually face will each defeat the rest of the system.

An industrial supply is specified by the process it feeds rather than by a population, so the intake, the main and the pumping are sized against the plant's draw and the head it has to be delivered at.

What KIPL executed

Intake well
The abstraction structure at the source.
Pipeline
8 km of water supply main.
Pumping works
The pumping installations serving the distribution requirement.

The outcome

Eight kilometres of main, intake and pumping delivered against the project's distribution requirement.

8 km
Water supply main
Intake well
Abstraction structure

Planning a project like this one?

Tell us about your site and your timeline. We will set out the approvals, the plan and the team to deliver it.