KESARI INFRABUILD PRIVATE LIMITEDEnvironmental Infrastructure Services
Back to projects

Water supply · infrastructure delivery

Adlabs Imagica, Khopoli: 12 km of water supply infrastructure

An intake structure at a reservoir edge in forested hills, with the rising main climbing away from it on pipe supports

01 02

Location
Khopoli, Maharashtra
Market
Hospitality, Healthcare & Education
Client
Adlabs Imagica
Practice
Sustainable Infrastructure & Project Delivery

Twelve kilometres of water supply infrastructure for Adlabs Imagica at Khopoli: intake well, transmission pipeline and pumping works bringing water to a destination park whose demand is concentrated and highly seasonal.

The brief

Water supply is a chain, and it is only as good as its weakest link: an intake that silts, a main that leaks, or a pump sized for a head it does not actually face will each defeat the rest of the system.

A theme park's water demand is unlike a town's: it peaks hard on weekends and holidays and falls away between them, so the supply has to be sized for the peak while the intake and pumping remain workable at everything below it.

What KIPL executed

Intake well
The abstraction structure at the source.
Transmission pipeline
12 km of main to the site.
Pumping works
The pumping installations along the main.

The outcome

Twelve kilometres of main, intake and pumping in service for the park at Khopoli.

12 km
Water supply main
Intake well
Abstraction structure

Planning a project like this one?

Tell us about your site and your timeline. We will set out the approvals, the plan and the team to deliver it.