Water supply · infrastructure delivery

K Raheja, Malad: 5 km of water supply works

A water main being laid along an urban service road, pipe in an open trench with barricades, a commercial development under construction behind

01 02

Location
Malad, Mumbai
Market
Real Estate & Construction
Client
K Raheja
Practice
Sustainable Infrastructure & Project Delivery

Five kilometres of water supply works for the K Raheja project at Malad, Mumbai: intake, pipeline and pumping infrastructure.

The brief

Water supply is a chain, and it is only as good as its weakest link: an intake that silts, a main that leaks, or a pump sized for a head it does not actually face will each defeat the rest of the system.

Laying five kilometres of main through a built-up part of Mumbai is a sequencing problem as much as a hydraulic one: the route has to be taken through existing development, existing services and live traffic.

What KIPL executed

Intake
The abstraction arrangement at the source.
Pipeline
5 km of water supply main.
Pumping infrastructure
The pumping installations serving the main.

The outcome

Five kilometres of main, intake and pumping in service for the project at Malad.

5 km
Water supply main
Intake
Abstraction arrangement