A 200 kg/day organic waste converter in MS powder-coated steel for Varsha Group at Kharghar, processing the development's biodegradable waste where it is produced.
The brief
Biodegradable waste leaving a development is a collection problem, a transport cost and, at the far end of it, landfill. Processing it on site removes all three. The unit here is sized at 200 kg/day, which is what the development generates.
The unit is built in MS powder-coated steel. Powder coating over mild steel is the standard build for this duty: it holds up to a wet, warm plant room at a cost that suits a single development.
What KIPL executed
- Organic waste converter
- A 200 kg/day unit for the development's biodegradable waste.
- MS powder-coated construction
- Built in MS powder-coated steel for the conditions of a plant room.
- Installation
- Positioning, connection and handover to the operating team.