KESARI INFRABUILD PRIVATE LIMITEDEnvironmental Infrastructure Services
Back to projects

Organic waste · on-site processing

Swaminarayan, Kalyan: a 350 kg/day organic waste converter

A green KIPL organic waste converter on castors under a building podium, feed hopper above and control panel to one side

A KIPL organic waste converter installed in a society podium

01 02

Location
Kalyan, Maharashtra
Market
Real Estate & Construction
Client
Swaminarayan
Practice
Water, Wastewater & Solid Waste Management

A 350 kg/day organic waste converter in MS powder-coated steel for Swaminarayan at Kalyan, processing the development's biodegradable waste where it is produced.

The brief

Biodegradable waste leaving a development is a collection problem, a transport cost and, at the far end of it, landfill. Processing it on site removes all three. The unit here is sized at 350 kg/day, which is what the development generates.

The unit is built in MS powder-coated steel. Powder coating over mild steel is the standard build for this duty: it holds up to a wet, warm plant room at a cost that suits a single development.

What KIPL executed

Organic waste converter
A 350 kg/day unit for the development's biodegradable waste.
MS powder-coated construction
Built in MS powder-coated steel for the conditions of a plant room.
Installation
Positioning, connection and handover to the operating team.

The outcome

350 kg a day of biodegradable waste processed where it is produced at Kalyan.

350 kg/day
Processing capacity
MS powder-coated
Construction

Planning a project like this one?

Tell us about your site and your timeline. We will set out the approvals, the plan and the team to deliver it.