KESARI INFRABUILD PRIVATE LIMITEDEnvironmental Infrastructure Services
Back to projects

Organic waste · on-site processing

Chaitanya Developers, Karanjade: a 50 kg/day organic waste converter

An industrial KIPL organic waste converter with extraction ducting, beside stainless curing racks of composting material in a covered hall

A KIPL organic waste converter with the curing racks it feeds

01 02

Location
Karanjade, Navi Mumbai
Market
Real Estate & Construction
Client
Chaitanya Developers
Practice
Water, Wastewater & Solid Waste Management

A 50 kg/day organic waste converter in MS powder-coated steel for Chaitanya Developers at Karanjade, processing the development's biodegradable waste where it is produced: the same site also runs a 50 KLD MBBR sewage plant.

The brief

Biodegradable waste leaving a development is a collection problem, a transport cost and, at the far end of it, landfill. Processing it on site removes all three. The unit here is sized at 50 kg/day, which is what the development generates.

The unit is built in MS powder-coated steel. Powder coating over mild steel is the standard build for this duty: it holds up to a wet, warm plant room at a cost that suits a single development.

The same development also carries a 50 KLD MBBR sewage plant, so both its sewage and its solid organic waste are dealt with on site.

What KIPL executed

Organic waste converter
A 50 kg/day unit for the development's biodegradable waste.
MS powder-coated construction
Built in MS powder-coated steel for the conditions of a plant room.
Installation
Positioning, connection and handover to the operating team.

The outcome

50 kg a day of biodegradable waste processed where it is produced at Karanjade, on a development that also treats its own sewage through a 50 KLD MBBR sewage plant.

50 kg/day
Processing capacity
MS powder-coated
Construction

Planning a project like this one?

Tell us about your site and your timeline. We will set out the approvals, the plan and the team to deliver it.