Arham Developers, Kharghar: a 100 kg/day organic waste converter

A green KIPL organic waste converter with feed hopper, discharge hatch and a panel of phase indicators, timer and heater controls

A KIPL organic waste converter and its control panel

01 02

Location
Kharghar, Navi Mumbai
Market
Real Estate & Construction
Client
Arham Developers
Practice
Water, Wastewater & Solid Waste Management

A 100 kg/day organic waste converter in MS powder-coated steel for Arham Developers at Kharghar, processing the development's biodegradable waste where it is produced: the same site also runs a 100 KLD MBBR sewage plant.

The brief

Biodegradable waste leaving a development is a collection problem, a transport cost and, at the far end of it, landfill. Processing it on site removes all three. The unit here is sized at 100 kg/day, which is what the development generates.

The unit is built in MS powder-coated steel. Powder coating over mild steel is the standard build for this duty: it holds up to a wet, warm plant room at a cost that suits a single development.

The same development also carries a 100 KLD MBBR sewage plant, so both its sewage and its solid organic waste are dealt with on site.

What KIPL executed

Organic waste converter
A 100 kg/day unit for the development's biodegradable waste.
MS powder-coated construction
Built in MS powder-coated steel for the conditions of a plant room.
Installation
Positioning, connection and handover to the operating team.

The outcome

100 kg a day of biodegradable waste processed where it is produced at Kharghar, on a development that also treats its own sewage through a 100 KLD MBBR sewage plant.

100 kg/day
Processing capacity
MS powder-coated
Construction